Line 28: Line 28:
  * The week of 12/10: Replace the yaw FR on the TF for Y-front/end.
  * The week of 12/17: Replace the yaw FR on the TF for X-front/end.
  * The week of 12/10: Replacement of the yaw FR on the TF for Y-front/end.
  * The week of 12/17: Replacement of the yaw FR on the TF for X-front/end.

VIS Weekly Report 2018/11/23

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

[Y-end]

  • Installed the geophone pods. Connected the cables and checked the signals by the digital system.
  • Tuned the load for BF adjusting the weight of cryo-payload.
  • The height of mirror was set to -6mm from the beam axis.

[Y-front]

  • Tuned the load for BF adjusting the weight of cryo-payload.
  • The LVDT output for the keystone height in BF was changed from the last time. The sign was flipped.
  • Calibrated the LVDT in BF.
  • The height of mirror was set -7mm from the beam axis. The height of BF was 64mm.
  • Adjusted the keystone height in TF. It was set to -7mm.

Plan for coming weeks

  • The week of 12/10: Replacement of the yaw FR on the TF for Y-front/end.
  • The week of 12/17: Replacement of the yaw FR on the TF for X-front/end.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • Nov. 28(Wed) 11:30 - : Crane inspection

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Travel Plans

  • Travel (Week of 11/26):
    • Takahashi: 27-30
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 12/3):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/11/30(Fri)

KAGRA/Subgroups/VIS/VISMinutes20181123 (last edited 2018-11-24 14:25:45 by MarkBarton)