Line 47: Line 47:
 * New vacuum vent schedule === New vacuum vent schedule ===
==== VIS works ====
 * 12/12-13: IY Type-A Yaw FR install (pump down from 12/14)
 * 12/10-14: EY Type-A Yaw FR install
 * 12/11 - 14: SR FR replacement

 * 1/8-10: IX Yaw FR install (Break vacuum & pump down in the same week)
 * 1/8-11: BS maintenance works
 * 1/8-10: PR2 OSEM cable repair
 * 1/14-18: EX Yaw FR install & FR repair

 * 1/8 - 11: IMMT Shield install

==== Monitoring work ====
 * 12/14: Floor repair near PR2
 * 12/14: IYC pumpdown.
 * 12/17-18: IYC open.

 * 1/7-8: EXC/IXC/Center open
 * 1/7: EYC pump down
 * 1/14-15: EYC open
 * 1/14: IYC/IXC pumpdown
 * 1/28: Center pumpdown

 * 2/11: EYC pumpdown
 * 3/11: EXC pumpdown

Agenda/Minutes of the VIS Meeting on 2018/11/30

2018/11/30 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

New vacuum vent schedule

VIS works

  • 12/12-13: IY Type-A Yaw FR install (pump down from 12/14)
  • 12/10-14: EY Type-A Yaw FR install
  • 12/11 - 14: SR FR replacement
  • 1/8-10: IX Yaw FR install (Break vacuum & pump down in the same week)

  • 1/8-11: BS maintenance works
  • 1/8-10: PR2 OSEM cable repair
  • 1/14-18: EX Yaw FR install & FR repair

  • 1/8 - 11: IMMT Shield install

Monitoring work

  • 12/14: Floor repair near PR2
  • 12/14: IYC pumpdown.
  • 12/17-18: IYC open.
  • 1/7-8: EXC/IXC/Center open
  • 1/7: EYC pump down
  • 1/14-15: EYC open
  • 1/14: IYC/IXC pumpdown
  • 1/28: Center pumpdown
  • 2/11: EYC pumpdown
  • 3/11: EXC pumpdown

Travel Plans

  • Travel (Week of 12/3):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 12/10):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/12/14(Fri)

KAGRA/Subgroups/VIS/VISMinutes20181130 (last edited 2018-12-01 20:07:38 by MarkBarton)