Agenda/Minutes of the VIS Meeting on 2018/11/30
2018/11/30 13:30 - 14:27
Participants: Okutomi, Sato, Fabian, Mark, Ishizaki, Aso, Hirata, Enzo, Takahashi, Lucia, Kozu, Ohishi, Fujii
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[Y-end]
- Repaired the connector on the BF.
- Revised the swap cables for the cryo-payload.
[Y-front]
- Calibrated and evaluated the ACCs.
Plan for coming weeks
- Replacement of the yaw FRs in Y-front and Y-end.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
New vacuum vent schedule
VIS works
- 12/12-13: IY Type-A Yaw FR install (pump down from 12/14)
- 12/10-14: EY Type-A Yaw FR install
- 12/11 - 14: SR FR replacement
1/8-10: IX Yaw FR install (Break vacuum & pump down in the same week)
- 1/8-11: BS maintenance works
- 1/8-10: PR2 OSEM cable repair
1/14-18: EX Yaw FR install & FR repair
- 1/8 - 11: IMMT Shield install
Monitoring work
- 12/14: Floor repair near PR2 (Hirata)
- 12/14: IYC pumpdown. (Lucia)
- 12/17-18 (need to check the date): IYC open.(Lucia, Fujii, Fabian)
- 1/7-8: EXC/IXC/Center open (Fabian, Fujii, Aso)
- 1/7: EYC pump down (Fabian, Fujii, Aso)
- 1/14-15: EYC open (Lucia, Fabian)
- 1/14: IYC/IXC pumpdown (Lucia, Fabian)
- 1/28: Center pumpdown (Lucia, Fabian, Mark)
- 2/11: EYC pumpdown (TBD)
- 3/11: EXC pumpdown (TBD)
Travel Plans
- Travel (Week of 12/3):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 12/10):
- Takahashi: 10-14
- Okutomi:
- Sato: 10-14
- Lucia: 10-14
- Fabian: 10-14
- Mark: 10-14
- Hirata: 10-14
Enzo:10-14
- Shoda:
- Ohishi:
- Fujii: 10-14
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/12/14(Fri)