Differences between revisions 5 and 6
Revision 5 as of 2018-11-30 14:28:10
Size: 2841
Editor: YoichiAso
Comment:
Revision 6 as of 2018-11-30 14:28:21
Size: 2846
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
2018/11/30 13:30 - 2018/11/30 13:30 - 14:27

Agenda/Minutes of the VIS Meeting on 2018/11/30

2018/11/30 13:30 - 14:27

Zoom Meeting

Participants: Okutomi, Sato, Fabian, Mark, Ishizaki, Aso, Hirata, Enzo, Takahashi, Lucia, Kozu, Ohishi, Fujii

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

[Y-end]

  • Repaired the connector on the BF.
  • Revised the swap cables for the cryo-payload.

[Y-front]

  • Calibrated and evaluated the ACCs.

Plan for coming weeks

  • Replacement of the yaw FRs in Y-front and Y-end.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

New vacuum vent schedule

VIS works

  • 12/12-13: IY Type-A Yaw FR install (pump down from 12/14)
  • 12/10-14: EY Type-A Yaw FR install
  • 12/11 - 14: SR FR replacement
  • 1/8-10: IX Yaw FR install (Break vacuum & pump down in the same week)

  • 1/8-11: BS maintenance works
  • 1/8-10: PR2 OSEM cable repair
  • 1/14-18: EX Yaw FR install & FR repair

  • 1/8 - 11: IMMT Shield install

Monitoring work

  • 12/14: Floor repair near PR2 (Hirata)
  • 12/14: IYC pumpdown. (Lucia)
  • 12/17-18 (need to check the date): IYC open.(Lucia, Fujii, Fabian)
  • 1/7-8: EXC/IXC/Center open (Fabian, Fujii, Aso)
  • 1/7: EYC pump down (Fabian, Fujii, Aso)
  • 1/14-15: EYC open (Lucia, Fabian)
  • 1/14: IYC/IXC pumpdown (Lucia, Fabian)
  • 1/28: Center pumpdown (Lucia, Fabian, Mark)
  • 2/11: EYC pumpdown (TBD)
  • 3/11: EXC pumpdown (TBD)

Travel Plans

  • Travel (Week of 12/3):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 12/10):
    • Takahashi: 10-14
    • Okutomi:
    • Sato: 10-14
    • Lucia: 10-14
    • Fabian: 10-14
    • Mark: 10-14
    • Hirata: 10-14
    • Enzo:10-14

    • Shoda:
    • Ohishi:
    • Fujii: 10-14
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/12/14(Fri)

KAGRA/Subgroups/VIS/VISMinutes20181130 (last edited 2018-12-01 20:07:38 by MarkBarton)