Size: 1994
Comment:
|
Size: 2355
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
[Y-front] * Replaced the yaw FR. * Mounted the ACCs onto the PI. * Released the IP. Closed the chamber. [Y-end] * Replaced the yaw FR. * Tuned the TF. * Released the IP. Closed the chamber. [X-front] * Established the inertial damping of IP using ACCs with LVDTs. |
|
Line 20: | Line 33: |
* Replacement of the yaw FR for X-front in Jan. 10-11. | |
Line 49: | Line 63: |
* IYC vent: 12/19(Wed) - 21(Fri) Fujii, Fabian, Lucia (19-20) ? | * IYC vent: 12/19(Wed) - 21(Fri) Fujii, Fabian, Lucia (19-20) |
Line 51: | Line 65: |
* EXC/IXC vent: 1/7(Mon) - 9(Wed) Fujii, Aso ? * EYC pump down: 1/10(Thu) Fujii, Aso ? * EYC vent: 1/17(Thu) - 1/19(Sat), Lucia, Fabian ? |
* EXC/IXC vent: 1/7(Mon) - 9(Wed) Fabian, Fujii, Aso * EYC pump down: 1/10(Thu) Fabian, Fujii, Aso * EYC vent: 1/17(Thu) - 1/19(Sat), Lucia, Fabian |
Agenda/Minutes of the VIS Meeting on 2018/12/14
2018/12/14 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[Y-front]
- Replaced the yaw FR.
- Mounted the ACCs onto the PI.
- Released the IP. Closed the chamber.
[Y-end]
- Replaced the yaw FR.
- Tuned the TF.
- Released the IP. Closed the chamber.
[X-front]
- Established the inertial damping of IP using ACCs with LVDTs.
Plan for coming weeks
- Replacement of the yaw FR for X-front in Jan. 10-11.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Vacuum Monitoring Shift
- IYC pump down: on going
- IYC vent: 12/19(Wed) - 21(Fri) Fujii, Fabian, Lucia (19-20)
- EXC/IXC vent: 1/7(Mon) - 9(Wed) Fabian, Fujii, Aso
- EYC pump down: 1/10(Thu) Fabian, Fujii, Aso
- EYC vent: 1/17(Thu) - 1/19(Sat), Lucia, Fabian
Thesis defence practice
- Kozu-kun and Arai-kun: after the next VIS meeting (12/21)
Travel Plans
- Travel (Week of 12/17):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 12/24):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/12/21(Fri)