Differences between revisions 2 and 3
Revision 2 as of 2019-01-11 12:47:45
Size: 2074
Comment:
Revision 3 as of 2019-01-11 13:08:03
Size: 2669
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:

[X-arm measurement]
  * Measurement campaign with X-arm was conducted.
    * Some stages were excited and then the couplings to the TML etc were measured.
    * Excited dofs were: TML / IML / MNL / IPL / (partly BFL) / BF-GAS / IMV / TMP
    * The purpose was to get the followings:
      * Vibration isolation performance (GND2TML)
      * force transfer functions of TML2TML, IML2TML, MNL2TML
      * couplings of V2L, P2L (somehow I forgot to measure Y2L coupling)
    * Now analysis is ongoing.
      * force TFs are in [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7573 | klog#7573]]

Agenda/Minutes of the VIS Meeting on 2019/1/11

2019/1/11 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

[Y-end]

  • Calibrated the LVDTs for BF damper.
  • Started the evacuation of EYV chamber. The IP is touching the stopper.

[X-end]

  • Prepared for the payload extraction. Fixed the BF and pushed down the keystone of TF.
  • Replaced the yaw FR.

[X-arm measurement]

  • Measurement campaign with X-arm was conducted.
    • Some stages were excited and then the couplings to the TML etc were measured.
    • Excited dofs were: TML / IML / MNL / IPL / (partly BFL) / BF-GAS / IMV / TMP
    • The purpose was to get the followings:
      • Vibration isolation performance (GND2TML)
      • force transfer functions of TML2TML, IML2TML, MNL2TML
      • couplings of V2L, P2L (somehow I forgot to measure Y2L coupling)
    • Now analysis is ongoing.

Plan for coming weeks

  • Replacement of the yaw FR in X-front on 17-18.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Confirmation of the VIS schedule for Jan.

Thesis defence practice

  • Kozu-kun and Arai-kun: after the next VIS meeting (12/21)

Travel Plans

  • Travel (Week of 1/14):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 1/21):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2019/1/18(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190111 (last edited 2019-01-11 15:00:29 by YoichiAso)