[X-front] * Assembled yaw rotation mechanism (yaw FR) with the stepping motor. * Attached the yaw FR to the top plate. Connected the cable. * Tested the stepping motor. The friction to the TF receptacle was very large. * The yaw torque to the BF was large. Lifted up the BF by 4mm. The torque was settled. * Found the screw for the brim ring stuck. It was repaired and reinstalled. * Adjusted the yaw position of BF damper. |
|
Line 20: | Line 28: |
* Lock the IP in Y-end. * Adjust the IP position and the level of BF in Y-front. |
Agenda/Minutes of the VIS Meeting on 2019/1/18
2019/1/18 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[X-front]
- Assembled yaw rotation mechanism (yaw FR) with the stepping motor.
- Attached the yaw FR to the top plate. Connected the cable.
- Tested the stepping motor. The friction to the TF receptacle was very large.
- The yaw torque to the BF was large. Lifted up the BF by 4mm. The torque was settled.
- Found the screw for the brim ring stuck. It was repaired and reinstalled.
- Adjusted the yaw position of BF damper.
Plan for coming weeks
- Lock the IP in Y-end.
- Adjust the IP position and the level of BF in Y-front.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
- Crane inspection: 1/21 11:30 - 12:30
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 1/21):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 1/28):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2019/1/18(Fri)