Size: 1592
Comment:
|
Size: 5337
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2019/2/15 13:30 - |
2019/2/15 13:30 - |
Line 17: | Line 16: |
Type-C: ([[ https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9013|XLSX]]) | Type-C: ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9013|XLSX]]) |
Line 21: | Line 20: |
[Y-end] * Checked the height of filters by the release sensor. The filters were not touching the sensors. * The F3 keystone was touching the stopper. Adjusted the weight on the BF. * The motion of BF keystone was very damped. Adjusted the position of secondary coil. * Adjusted the gain for F0 LVDT in the driver. Calibrated the F0 LVDT. * Adjusted the phase/gain for IP LVDT in the driver. Calibrated the IP LVDTs. * Set the height of F0 keystone to -9mm so that the height of BF can be at the nominal posision. * Released the IP. Each (H1, H2, H3) transfer function and spectrum looked natural. * Diagonalized transfer functions and spectra showed that the mode L and T are not degenerated (0.07Hz and 0.13Hz). * Checked inside of the corrugate tube by the long fiber scope. Any problems were not found. |
|
Line 22: | Line 32: |
* Adjustment of the TF, the BF damper, and the IP in X-end (Feb 26-28). | |
Line 24: | Line 35: |
==== Past week report ==== | ==== Report for week of 2/12 (February 12th) ==== * On Saturday we moved the vertical IM OSEMs in order to compensate for a large pitch in the IM introduced when the IR laser as aligned. * I took transfer functions over the weekend and the system looks healthy. * Although moving the OSEMs was done successfully, I accidentally pulled the cables and moved the flying saucer cable clamp set. I rotated it back judging the position by visual inspection, but an IM yaw drift appeared since then. It's moving with a speed of 0.2 urad/min. * On Tuesday we moved the Im back to zero but the drift continued. At the time of writing these lines it is at -833 urad, with H2 and H3 at 93 um and 47 um and still drifting. * On Saturday we connected the SRM geophones in-air cables and confirmed we had a signal. * However, on Wednesday morning the geophones are not giving any signal. We cheked the master model channel and realized the problem was not the slave model. We suspect a hardware fault. * I checked the in-air cables were connected. * We released the SRM optical bench and wiped the places where sticky tape was used to fix support blocks. * We wiped the SR2 optical bench and security structure. SR3 and SRM had been wiped by Hirose-san, Hirata-san and Fujii-kun. * Terrence started the previously prepared new model tower models for SRM and BS with the new ALIGN filters which is a copy of the TEST filter. The WD threshold for LVDTs and geophones are now separated. * Terrence worked on splitting the real-time models for the SR2 and SR3. The models worked with the new features now, with DAQ reset in some cases and with help of Miyakawa-san for configuring some DGS related documents (rtcsystab, master, safe.snap, etc). * Before starting the new models for SR2, Terrence completely shut off SR2 and swapped the power spool with the power strip that was previously prepared. * Terrence edited the DGS OVERALL screen to show the new SR2 and SR3 models. The TYPE B OVERALL MEDM screen was also modified so taking separate snapshots for the ALIGN and OPTIC ALIGN blocks is available. The corresponding burt request files were also created. * The corresponding Marco files were also updated to account for the model split and the new DCUIDs. Some mistakes in the Marco files were fixed. * The Guardian systems for all TYPE B suspensions were all shut off and the suspensions were put in the safe mode manually. * All Type B Guardian modules are pointing to the generic type B Guardian model (TYPEB.py). It was partially modified for the commissioning next week and Terrence will keep working on it in the afternoon. * Today the pumping down of the central area will begin around noon. We will monitor the four inverted pendulums |
Line 26: | Line 56: |
Line 30: | Line 59: |
Line 34: | Line 62: |
Line 38: | Line 65: |
Line 40: | Line 66: |
* Crane inspection: Feb 22nd 11:30 - 12:30 | |
Line 45: | Line 71: |
* Type-A: | * Type-A: |
Line 49: | Line 75: |
Line 52: | Line 77: |
* Takahashi: * Okutomi: * Sato: * Lucia: * Fabian: * Mark: * Hirata: * Enzo: |
* Takahashi: * Okutomi: 18-22 * Sato: * Lucia: * Fabian: * Mark: 19-22 * Hirata: * Enzo: 19-22 |
Line 62: | Line 87: |
* Fujii: | * Fujii: 19-22 |
Line 64: | Line 89: |
* Tanaka: * Terrence |
* Tanaka: * Terrence:18-22 |
Line 68: | Line 93: |
* Takahashi: | * Takahashi: 26-28 |
Line 70: | Line 95: |
* Sato: * Lucia: * Fabian: * Mark: * Hirata: * Enzo: |
* Sato: * Lucia: * Fabian: * Mark: 25-1 * Hirata: * Enzo: 25-1 |
Line 78: | Line 103: |
* Fujii: | * Fujii: 25-1 |
Line 80: | Line 105: |
* Terrence | * Terrence: 25-1 |
Agenda/Minutes of the VIS Meeting on 2019/2/15
2019/2/15 13:30 -
Participants:
Progress report
Schedule Chart
Site work schedule: [[|XLSX]]
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[Y-end]
- Checked the height of filters by the release sensor. The filters were not touching the sensors.
- The F3 keystone was touching the stopper. Adjusted the weight on the BF.
- The motion of BF keystone was very damped. Adjusted the position of secondary coil.
- Adjusted the gain for F0 LVDT in the driver. Calibrated the F0 LVDT.
- Adjusted the phase/gain for IP LVDT in the driver. Calibrated the IP LVDTs.
- Set the height of F0 keystone to -9mm so that the height of BF can be at the nominal posision.
- Released the IP. Each (H1, H2, H3) transfer function and spectrum looked natural.
- Diagonalized transfer functions and spectra showed that the mode L and T are not degenerated (0.07Hz and 0.13Hz).
- Checked inside of the corrugate tube by the long fiber scope. Any problems were not found.
Plan for coming weeks
- Adjustment of the TF, the BF damper, and the IP in X-end (Feb 26-28).
Type B (Mark)
Report for week of 2/12 (February 12th)
- On Saturday we moved the vertical IM OSEMs in order to compensate for a large pitch in the IM introduced when the IR laser as aligned.
- I took transfer functions over the weekend and the system looks healthy.
- Although moving the OSEMs was done successfully, I accidentally pulled the cables and moved the flying saucer cable clamp set. I rotated it back judging the position by visual inspection, but an IM yaw drift appeared since then. It's moving with a speed of 0.2 urad/min.
- On Tuesday we moved the Im back to zero but the drift continued. At the time of writing these lines it is at -833 urad, with H2 and H3 at 93 um and 47 um and still drifting.
- On Saturday we connected the SRM geophones in-air cables and confirmed we had a signal.
- However, on Wednesday morning the geophones are not giving any signal. We cheked the master model channel and realized the problem was not the slave model. We suspect a hardware fault.
- I checked the in-air cables were connected.
- We released the SRM optical bench and wiped the places where sticky tape was used to fix support blocks.
- We wiped the SR2 optical bench and security structure. SR3 and SRM had been wiped by Hirose-san, Hirata-san and Fujii-kun.
- Terrence started the previously prepared new model tower models for SRM and BS with the new ALIGN filters which is a copy of the TEST filter. The WD threshold for LVDTs and geophones are now separated.
- Terrence worked on splitting the real-time models for the SR2 and SR3. The models worked with the new features now, with DAQ reset in some cases and with help of Miyakawa-san for configuring some DGS related documents (rtcsystab, master, safe.snap, etc).
- Before starting the new models for SR2, Terrence completely shut off SR2 and swapped the power spool with the power strip that was previously prepared.
- Terrence edited the DGS OVERALL screen to show the new SR2 and SR3 models. The TYPE B OVERALL MEDM screen was also modified so taking separate snapshots for the ALIGN and OPTIC ALIGN blocks is available. The corresponding burt request files were also created.
- The corresponding Marco files were also updated to account for the model split and the new DCUIDs. Some mistakes in the Marco files were fixed.
- The Guardian systems for all TYPE B suspensions were all shut off and the suspensions were put in the safe mode manually.
- All Type B Guardian modules are pointing to the generic type B Guardian model (TYPEB.py). It was partially modified for the commissioning next week and Terrence will keep working on it in the afternoon.
- Today the pumping down of the central area will begin around noon. We will monitor the four inverted pendulums
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
- Crane inspection: Feb 22nd 11:30 - 12:30
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 2/18):
- Takahashi:
- Okutomi: 18-22
- Sato:
- Lucia:
- Fabian:
- Mark: 19-22
- Hirata:
- Enzo: 19-22
- Shoda:
- Ohishi:
- Fujii: 19-22
- Tanioka:
- Tanaka:
Terrence:18-22
- Travel (Week of 2/25):
- Takahashi: 26-28
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark: 25-1
- Hirata:
- Enzo: 25-1
- Shoda:
- Ohishi:
- Fujii: 25-1
- Tanioka:
- Terrence: 25-1
Next meeting
On 2019/2/22(Fri)