Size: 1725
Comment:
|
Size: 2904
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2019/2/22 13:30 - |
2019/2/22 13:30 - |
Line 17: | Line 16: |
Type-C: ([[ https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9013|XLSX]]) | Type-C: ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9013|XLSX]]) |
Line 21: | Line 20: |
* Aligned the ITMY by the yaw FR in the TF (by Lucia). | * Aligned the ITMY by the yaw FR in the TF (by Lucia). |
Line 24: | Line 23: |
* Adjustment of the TF, the BF damper, and the IP in X-end (Feb 26-28). | * Adjustment of the TF, the BF damper, and the IP in X-end (Feb 26-28). |
Line 28: | Line 27: |
* On Friday and Saturday last week the pump down of the central area took place. We monitored the drift in the four Type B IPs. * During the week we recovered the four suspensions successfully: we recovered the alignment of IMs, GAS filters, IPs, oplevs and measured TFs. * Terrence, Enzo and Mark installed the length sensing components in SR2 oplev. It's working now and we should use it now to measure the optic's corresponding TF. * The SRM IM is still drifting but the speed is decreasing. Yesterday Thursday the speed was '''-81 nrad/min'''. With the aim of predicting when the drift may stop Terrece removed offsets from the time series segments and spliced them in order. The work is still on progress. * Terrence did more work in changing the real-time models. * Mark did some initial debugging on the stepper reset system, starting with SRM. However there seems to be some model-related problem. A BIO Checker Board gave sensible results for the low 32 bits of DIO card #0 (used for the TM LPCD) but nothing for the high 32 bits (used for steppers, and eventually also the WD). He added the stepper reset stuff to the circuit diagram (D1503660) and made other corrections. |
|
Line 29: | Line 35: |
Line 33: | Line 38: |
Line 37: | Line 41: |
Line 41: | Line 44: |
Line 43: | Line 45: |
Line 48: | Line 49: |
* Type-A: | * Type-A: |
Line 52: | Line 53: |
Line 55: | Line 55: |
* Takahashi: | * Takahashi: |
Line 57: | Line 57: |
* Sato: * Lucia: * Fabian: * Mark: * Hirata: |
* Sato: * Lucia: * Fabian: * Mark: * Hirata: |
Line 65: | Line 65: |
* Fujii: | * Fujii: |
Line 71: | Line 71: |
* Takahashi: | * Takahashi: |
Line 73: | Line 73: |
* Sato: * Lucia: * Fabian: |
* Sato: * Lucia: * Fabian: |
Line 77: | Line 77: |
* Hirata: | * Hirata: |
Line 81: | Line 81: |
* Fujii: | * Fujii: |
Agenda/Minutes of the VIS Meeting on 2019/2/22
2019/2/22 13:30 -
Participants:
Progress report
Schedule Chart
Site work schedule: [[|XLSX]]
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
- Aligned the ITMY by the yaw FR in the TF (by Lucia).
Plan for coming weeks
- Adjustment of the TF, the BF damper, and the IP in X-end (Feb 26-28).
Type B (Mark)
Past week report
- On Friday and Saturday last week the pump down of the central area took place. We monitored the drift in the four Type B IPs.
- During the week we recovered the four suspensions successfully: we recovered the alignment of IMs, GAS filters, IPs, oplevs and measured TFs.
- Terrence, Enzo and Mark installed the length sensing components in SR2 oplev. It's working now and we should use it now to measure the optic's corresponding TF.
The SRM IM is still drifting but the speed is decreasing. Yesterday Thursday the speed was -81 nrad/min. With the aim of predicting when the drift may stop Terrece removed offsets from the time series segments and spliced them in order. The work is still on progress.
- Terrence did more work in changing the real-time models.
- Mark did some initial debugging on the stepper reset system, starting with SRM. However there seems to be some model-related problem. A BIO Checker Board gave sensible results for the low 32 bits of DIO card #0 (used for the TM LPCD) but nothing for the high 32 bits (used for steppers, and eventually also the WD). He added the stepper reset stuff to the circuit diagram (D1503660) and made other corrections.
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 2/25):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Terrence
- Travel (Week of 3/4):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Terrence
Next meeting
On 2019/3/1(Fri)