[X-end] * Attached the secondary coils of BF damper (vertical). * Released the BF, the TF and the IP. * Adjusted the tilt and the yaw position of BF. * Connected the BIO cables in the new rack division (by Fujii). [Y-front} * Ch.1 ACC was not working. Changed the driver for ch.1 from "NM4" to "NM2". * Still the ACCs are not working well (by Lucia). |
|
Line 22: | Line 32: |
* Final check of EXV before evacuation (Mar 18-20) |
Agenda/Minutes of the VIS Meeting on 2019/3/1
2019/3/1 13:30 -
Participants:
Progress report
Schedule Chart
Site work schedule: [[|XLSX]]
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[X-end]
- Attached the secondary coils of BF damper (vertical).
- Released the BF, the TF and the IP.
- Adjusted the tilt and the yaw position of BF.
- Connected the BIO cables in the new rack division (by Fujii).
[Y-front}
- Ch.1 ACC was not working. Changed the driver for ch.1 from "NM4" to "NM2".
- Still the ACCs are not working well (by Lucia).
Plan for coming weeks
- Final check of EXV before evacuation (Mar 18-20)
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 3/4):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Terrence
- Travel (Week of 3/11):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Terrence
Next meeting
On 2019/3/8(Fri)