Differences between revisions 2 and 3
Revision 2 as of 2019-03-01 11:04:17
Size: 2017
Comment:
Revision 3 as of 2019-03-01 14:42:26
Size: 2046
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 68: Line 68:
  * Mark:   * Mark: 4-6
Line 76: Line 76:
  * Terrence   * Terrence:
Line 80: Line 80:
  * Okutomi:   * Okutomi: 11-15
Line 84: Line 84:
  * Mark:   * Mark: 11-15
Line 86: Line 86:
  * Enzo:   * Enzo: 11-15
Line 89: Line 89:
  * Fujii:   * Fujii: 11-15
Line 91: Line 91:
  * Terrence   * Terrence:

Agenda/Minutes of the VIS Meeting on 2019/3/1

2019/3/1 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Site work schedule: [[|XLSX]]

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

[X-end]

  • Attached the secondary coils of BF damper (vertical).
  • Released the BF, the TF and the IP.
  • Adjusted the tilt and the yaw position of BF.
  • Connected the BIO cables in the new rack division (by Fujii).

[Y-front}

  • Ch.1 ACC was not working. Changed the driver for ch.1 from "NM4" to "NM2".
  • Still the ACCs are not working well (by Lucia).

Plan for coming weeks

  • Final check of EXV before evacuation (Mar 18-20)

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Travel Plans

  • Travel (Week of 3/4):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark: 4-6
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence:
  • Travel (Week of 3/11):
    • Takahashi:
    • Okutomi: 11-15
    • Sato:
    • Lucia:
    • Fabian:
    • Mark: 11-15
    • Hirata:
    • Enzo: 11-15
    • Shoda:
    • Ohishi:
    • Fujii: 11-15
    • Tanioka:
    • Terrence:

Next meeting

On 2019/3/8(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190301 (last edited 2019-03-01 16:42:21 by MarkBarton)