Size: 2051
Comment:
|
Size: 2236
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
Participants: | Participants: Takahashi, Hirata, Sato, Ishizaki, Okutomi, Tanaka, Mark, Lucia, Terrence, Kozu, Eleonora, Enzo, Fujii |
Line 11: | Line 11: |
Site work schedule: [[|XLSX]] | Site work schedule: [[https://www.dropbox.com/s/xcfpw8njocknzaz/Weekly%20schedule%20190305-VIS.xlsx?dl=0|XLSX]] |
Agenda/Minutes of the VIS Meeting on 2019/3/1
2019/3/1 13:30 - 14:42
Participants: Takahashi, Hirata, Sato, Ishizaki, Okutomi, Tanaka, Mark, Lucia, Terrence, Kozu, Eleonora, Enzo, Fujii
Progress report
Schedule Chart
Site work schedule: XLSX
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[X-end]
- Attached the secondary coils of BF damper (vertical).
- Released the BF, the TF and the IP.
- Adjusted the tilt and the yaw position of BF.
- Connected the BIO cables in the new rack division (by Fujii).
[Y-front}
- Ch.1 ACC was not working. Changed the driver for ch.1 from "NM4" to "NM2".
- Still the ACCs are not working well (by Lucia).
Plan for coming weeks
- Final check of EXV before evacuation (Mar 18-20)
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 3/4):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark: 4-6
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Terrence:
- Travel (Week of 3/11):
- Takahashi:
- Okutomi: 11-15
- Sato:
- Lucia:
- Fabian:
- Mark: 11-15
- Hirata:
- Enzo: 11-15
- Shoda:
- Ohishi:
- Fujii: 11-15
- Tanioka:
- Terrence:
Next meeting
On 2019/3/8(Fri)