[Okutomi, Fujii, Yamada] * Measured the transfer functions of payloads by the oplevs. * Implemented the oplev servo block to the payload models. * Updated all the real-time models. |
|
Line 16: | Line 21: |
* Preparation for the ER on 8th. | |
Line 25: | Line 31: |
=== OMMT & OSTM === | === OMMT & OSTM (Takahashi) === |
Line 27: | Line 33: |
[Sato] * Started the design of OSTM suspension. |
|
Line 28: | Line 37: |
* Taking out the MC-suspension from TAMA. |
Agenda/Minutes of the VIS Meeting on 2019/5/31
2019/5/31 13:30 -
Participants:
Progress report
Schedule
Site work schedule: [[|XLSX]]
Type-A (Takahashi)
Past week report
[Okutomi, Fujii, Yamada]
- Measured the transfer functions of payloads by the oplevs.
- Implemented the oplev servo block to the payload models.
- Updated all the real-time models.
Plan for coming weeks
- Preparation for the ER on 8th.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
[Sato]
- Started the design of OSTM suspension.
Plan for coming weeks
- Taking out the MC-suspension from TAMA.
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
- Mechanical repair necessary after O3
- Do we need to repair the ETMX F2 ?
- Can we repair the ITMY BF Yaw pico ?
- How to fix Type-B FRs ?
Travel Plans
- Travel (Week of 6/3):
- Takahashi:
- Sato:
- Mark:
- Hirata:
- Shoda:
- Fujii:
- Tanioka:
- Tanaka:
- Terrence:
- Travel (Week of 6/10):
- Takahashi:
- Sato:
- Mark:
- Hirata:
- Shoda:
- Fujii:
- Tanioka:
- Tanaka:
- Terrence:
Next meeting
On 2019/6/7(Fri)