==== Past week report ====
 * Moderate WD system is implemented.
==== Report for the week 5/27 (written by Fabian) ====
 * Shoda-san implemented the moderate watchdog: when tripping the amount of actuation will ramp down to zero smoothly. Klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9009|9009]].
 * Terrence updated the BS guardian.
 * Terrence designed a VIS status monitor. The font might be too small for some people.
 * Terrence worked on SRM inertial damping.
  * There is coherence between the geophones and LVDTs at 0.1 Hz.
  * He designed a filter with a blending frequency of 0.110 Hz.
  * The system seems stable.
 * For SR2 Fabian calculated the sensor noise fed back into the system by the control loop: entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8979|8979]].
  * The GAS filters' contrbution is too high.
  * I asked Enzo and he didn't rolled off the filters at higher frequecies.
  * Filter modification was assigned to Fabian.
 * Fabian and Yokozawa-san measured the settings of the SR3 LVDT driver. Klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9025|9025]].
Line 27: Line 39:
 * Terrence will work in the inertial damping.
 * In the weekly comissioning meeting Fabian made the commitment of writing a list of the measurements we want to do with the DRMI for Type B characterization.I will write it by next week and send it around for comnents.
Line 31: Line 45:
Line 35: Line 48:
Line 43: Line 57:
Line 45: Line 58:
Line 50: Line 62:
  * Type-A:    * Type-A:
Line 61: Line 73:
  * Takahashi: 
  * Sato: 
  * Mark: 
  * Hirata: 
  * Takahashi:
  * Sato:
  * Mark:
  * Hirata:
Line 66: Line 78:
  * Fujii:    * Fujii:
Line 72: Line 84:
  * Takahashi: 
  * Sato: 
  * Mark: 
  * Hirata: 
  * Takahashi:
  * Sato:
  * Mark:
  * Hirata:
Line 77: Line 89:
  * Fujii:    * Fujii:

Agenda/Minutes of the VIS Meeting on 2019/5/31

2019/5/31 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule

Site work schedule: [[|XLSX]]

Type-A (Takahashi)

Past week report

[Okutomi, Fujii, Yamada]

  • Measured the transfer functions of payloads by the oplevs.
  • Implemented the oplev servo block to the payload models.
  • Updated all the real-time models. (The moderate WD system is implemented.)

Plan for coming weeks

  • Preparation for the ER on 8th.

Type B (Mark)

Report for the week 5/27 (written by Fabian)

  • Shoda-san implemented the moderate watchdog: when tripping the amount of actuation will ramp down to zero smoothly. Klog entry 9009.

  • Terrence updated the BS guardian.
  • Terrence designed a VIS status monitor. The font might be too small for some people.
  • Terrence worked on SRM inertial damping.
    • There is coherence between the geophones and LVDTs at 0.1 Hz.
    • He designed a filter with a blending frequency of 0.110 Hz.
    • The system seems stable.
  • For SR2 Fabian calculated the sensor noise fed back into the system by the control loop: entry 8979.

    • The GAS filters' contrbution is too high.
    • I asked Enzo and he didn't rolled off the filters at higher frequecies.
    • Filter modification was assigned to Fabian.
  • Fabian and Yokozawa-san measured the settings of the SR3 LVDT driver. Klog entry 9025.

Plan for coming weeks

  • Terrence will work in the inertial damping.
  • In the weekly comissioning meeting Fabian made the commitment of writing a list of the measurements we want to do with the DRMI for Type B characterization.I will write it by next week and send it around for comnents.

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

[Sato]

  • Started the design of OSTM suspension.

Plan for coming weeks

  • Taking out the MC-suspension from TAMA.

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

  • Mechanical repair necessary after O3
    • Do we need to repair the ETMX F2 ?
    • Can we repair the ITMY BF Yaw pico ?
    • How to fix Type-B FRs ?

Travel Plans

  • Travel (Week of 6/3):
    • Takahashi:
    • Sato:
    • Mark:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence:
  • Travel (Week of 6/10):
    • Takahashi:
    • Sato:
    • Mark:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence:

Next meeting

On 2019/6/7(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190531 (last edited 2019-05-31 14:57:25 by YoichiAso)