Agenda/Minutes of the VIS Meeting on 2019/5/31

2019/5/31 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule

Site work schedule: [[|XLSX]]

Type-A (Takahashi)

Past week report

[Okutomi, Fujii, Yamada]

  • Measured the transfer functions of payloads by the oplevs.
  • Implemented the oplev servo block to the payload models.
  • Updated all the real-time models. (The moderate WD system is implemented.)

Plan for coming weeks

  • Preparation for the ER on 8th.

Type B (Mark)

Report for the week 5/27 (written by Fabian)

  • Shoda-san implemented the moderate watchdog: when tripping the amount of actuation will ramp down to zero smoothly. Klog entry 9009.

  • Terrence updated the BS guardian.
  • Terrence designed a VIS status monitor. The font might be too small for some people.
  • Terrence worked on SRM inertial damping.
    • There is coherence between the geophones and LVDTs at 0.1 Hz.
    • He designed a filter with a blending frequency of 0.110 Hz.
    • The system seems stable.
  • For SR2 Fabian calculated the sensor noise fed back into the system by the control loop: entry 8979.

    • The GAS filters' contrbution is too high.
    • I asked Enzo and he didn't rolled off the filters at higher frequecies.
    • Filter modification was assigned to Fabian.
  • Fabian and Yokozawa-san measured the settings of the SR3 LVDT driver. Klog entry 9025.

Plan for coming weeks

  • Terrence will work in the inertial damping.
  • In the weekly comissioning meeting Fabian made the commitment of writing a list of the measurements we want to do with the DRMI for Type B characterization.I will write it by next week and send it around for comnents.

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

[Sato]

  • Started the design of OSTM suspension.

Plan for coming weeks

  • Taking out the MC-suspension from TAMA.

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

  • Mechanical repair necessary after O3
    • Do we need to repair the ETMX F2 ?
    • Can we repair the ITMY BF Yaw pico ?
    • How to fix Type-B FRs ?

Travel Plans

  • Travel (Week of 6/3):
    • Takahashi:
    • Sato:
    • Mark:
    • Hirata:
    • Shoda:
    • Fujii: 3-7
    • Tanioka:
    • Tanaka:
    • Terrence:
  • Travel (Week of 6/10):
    • Takahashi:
    • Sato:
    • Mark:
    • Hirata:
    • Shoda:
    • Fujii: 10-14
    • Tanioka:
    • Tanaka:
    • Terrence:

Next meeting

On 2019/6/7(Fri)