= Agenda/Minutes of the VIS Meeting on 2019/5/31 = 2019/5/31 13:30 - 14:30 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Takahashi, Shoda, Hirata, Aso, Tanaka, Ishizaki, Sato, Fujii, Terrence == Progress report == === Schedule === Site work schedule: [[|XLSX]] === Type-A (Takahashi) === ==== Past week report ==== [Okutomi, Fujii, Yamada] * Measured the transfer functions of payloads by the oplevs. * Implemented the oplev servo block to the payload models. * Updated all the real-time models. (The moderate WD system is implemented.) ==== Plan for coming weeks ==== * Preparation for the ER on 8th. === Type B (Mark) === ==== Report for the week 5/27 (written by Fabian) ==== * Shoda-san implemented the moderate watchdog: when tripping the amount of actuation will ramp down to zero smoothly. Klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9009|9009]]. * Terrence updated the BS guardian. * Terrence designed a VIS status monitor. The font might be too small for some people. * Terrence worked on SRM inertial damping. * There is coherence between the geophones and LVDTs at 0.1 Hz. * He designed a filter with a blending frequency of 0.110 Hz. * The system seems stable. * For SR2 Fabian calculated the sensor noise fed back into the system by the control loop: entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8979|8979]]. * The GAS filters' contrbution is too high. * I asked Enzo and he didn't rolled off the filters at higher frequecies. * Filter modification was assigned to Fabian. * Fabian and Yokozawa-san measured the settings of the SR3 LVDT driver. Klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9025|9025]]. ==== Plan for coming weeks ==== * Terrence will work in the inertial damping. * In the weekly comissioning meeting Fabian made the commitment of writing a list of the measurements we want to do with the DRMI for Type B characterization.I will write it by next week and send it around for comnents. === Type-Bp (Shoda) === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Takahashi) === ==== Past week report ==== [Sato] * Started the design of OSTM suspension. ==== Plan for coming weeks ==== * Taking out the MC-suspension from TAMA. === VIS electronics (Tanaka) === ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: no incident * Foreseen risks * Type-A: no * Type-B: no == Discussion == * Mechanical repair necessary after O3 * Do we need to repair the ETMX F2 ? * We will not attempt to repair this before O4 * Can we repair the ITMY BF Yaw pico ? * We will inspect the BF pico first. * Depending on the cause of the trouble, we try to fix it. * Type-Bp magnet polarization problems (PRM IM and PR2 TM) * Estimate magnetic noise coupling first. * If the estimated noise is too large, we will attempt to fix the problem. * How to fix the Type-B FR problems ? * Can we fix the problem by re-adjusting the ballast masses ? * Check the details of the problem with Mark and Fabian. == Travel Plans == * Travel (Week of 6/3): * Takahashi: * Sato: * Mark: * Hirata: * Shoda: * Fujii: 3-7 * Tanioka: * Tanaka: * Terrence: * Travel (Week of 6/10): * Takahashi: * Sato: * Mark: * Hirata: * Shoda: * Fujii: 10-14 * Tanioka: * Tanaka: * Terrence: == Next meeting == On 2019/6/7(Fri)