Agenda/Minutes of the VIS Meeting on 2019/6/21

2019/6/21 13:30 -

Zoom Meeting

Participants:

Progress report

Type-A (Takahashi)

Past week report

  • Checked stock parts.
  • Sent back a spare ACC unit to Mitaka for developments.

News
  • ITMY
    • we decided to go with current configuration for the time being.
  • ETMY
    • During a measurement, YF kicked IP accidentally and the orientation of ETMY went away.
      • Everything should be free now since BFYexc and MNexc transfer functions looked consistent with the ones measured before this kick.
      • Only the orientation was changed somehow.
      • We decided to open the chamber. The cryocooler was turned off already.
    • During another measurement. it was found that F3-GAS was arriver at the current position (klog#).
      • since the shapes of the GAS mechanical transfer functions were changed from the precious ones, I updated the modeled transfer function and filters in the filter-bank.

Building damping system for payload
  • ITMX / ETMY
    • I started to measure the mechanical transfer functions with Photo-sensors for building.
      • ETMY-MN * 6dof, done. Sensor diagonalization would be necessary.

RT-model, MEDM, guardian updates

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Checked stock OSEMs. There are 17 units.
  • Disassembled the pillars of the MC suspension for modification.
  • Ordered the modification parts.

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

DAQ channel reduction

Realtime model update policy

  • Make local copies of the relevant files (.mdl, MEDM files etc) to modify an existing RTM.
    • Once the modifications are complete, you can deploy the modified files by replacing the existing ones.
  • Notify the relevant people (kagra-seis and gokagra ML) in advance (more than a day) of the deployment of the modified RTM.
  • Deployment should be complete.
    • Do not attempt a partial update, such as changing only ETMX. Update all the suspensions of the same kind (Type-A, B, Bp) at once, unless there is a good reason to do so.
    • Update MEDM screens at the same time to reflect changes in the RTM.
    • People can test the modified RTM during non-interferometer-commissioning time, i.e. in the morning.
      • After the test, the RTM should be reverted to the original one, before the interferometer commissioning starts.

Where to put the hardware WDS ?

  • Type-Bp: GAS LVDT ?
  • Type-B: IP ?
  • Type-A: IP ?

POS table cover box

Travel Plans

  • Travel (Week of 6/24):
    • Takahashi:
    • Sato:
    • Mark:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence:
  • Travel (Week of 7/1):
    • Takahashi:
    • Sato:
    • Mark:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence:

Next meeting

On 2019/6/28(Fri)