Differences between revisions 4 and 5
Revision 4 as of 2019-06-19 15:49:33
Size: 2075
Editor: YoichiAso
Comment:
Revision 5 as of 2019-06-21 08:55:19
Size: 2288
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * Checked stock parts.
 * Sent back a spare ACC unit to Mitaka for developments.
Line 22: Line 25:
=== OMMT & OSTM === === OMMT & OSTM (Takahashi) ===
Line 24: Line 27:
 * Checked stock OSEMs. There are 17 units.
 * Disassembled the pillars of the MC suspension for modification.

Agenda/Minutes of the VIS Meeting on 2019/6/21

2019/6/21 13:30 -

Zoom Meeting

Participants:

Progress report

Type-A (Takahashi)

Past week report

  • Checked stock parts.
  • Sent back a spare ACC unit to Mitaka for developments.

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Checked stock OSEMs. There are 17 units.
  • Disassembled the pillars of the MC suspension for modification.

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Realtime model update policy

  • Make local copies of the relevant files (.mdl, MEDM files etc) to modify an existing RTM.
    • Once the modifications are complete, you can deploy the modified files by replacing the existing ones.
  • Notify the relevant people (kagra-seis and gokagra ML) in advance (more than a day) of the deployment of the modified RTM.
  • Deployment should be complete.
    • Do not attempt a partial update, such as changing only ETMX. Update all the suspensions of the same kind (Type-A, B, Bp) at once, unless there is a good reason to do so.
    • Update MEDM screens at the same time to reflect changes in the RTM.
    • People can test the modified RTM during non-interferometer-commissioning time, i.e. in the morning.
      • After the test, the RTM should be reverted to the original one, before the interferometer commissioning starts.

Where to put the hardware WDS ?

  • Type-Bp: GAS LVDT ?
  • Type-B: IP ?
  • Type-A: IP ?

Travel Plans

  • Travel (Week of 6/24):
    • Takahashi:
    • Sato:
    • Mark:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence:
  • Travel (Week of 7/1):
    • Takahashi:
    • Sato:
    • Mark:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Terrence:

Next meeting

On 2019/6/28(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190621 (last edited 2019-06-21 14:38:35 by YoichiAso)