Size: 1184
Comment:
|
Size: 2247
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
[Okutomi] * Monitored the drift of the IP and GAS displacements of the ETMY during the air injection. * Tried to offload the DC output to the F3 GAS actuator with the FR, but it resulted that the stepper motor seems stuck. * The ETMY chamber is in air pressure. |
|
Line 16: | Line 21: |
* CRY team will recover the problem of the ETMY payload in 28-30th. | |
Line 23: | Line 29: |
* Auto-offload for GAS script is available from medm. * Summarizing information in wiki page. * Checking PR3 and PRM Traverser drivers * Actually PR3 driver is healthy according to Enomoto-kun, but R2 motor connection is found to be dead last week. * For PRM driver, PLC is working at least. We need 5-phase motors for the test. (I have only 2-phase one now.) |
|
Line 25: | Line 37: |
=== OMMT & OSTM === | === OMMT & OSTM (Takahashi) === |
Line 27: | Line 39: |
* Modification parts are under manufacturing. * Making the overall 3D model around OMC. |
|
Line 28: | Line 43: |
* Considering the delivery time of OSTM itself, the installation work at the site will be available in September. * Schedule was updated ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10364|PDF/MPP]]). |
|
Line 47: | Line 65: |
* Takahashi: | * Takahashi: 1-2 |
Agenda/Minutes of the VIS Meeting on 2019/6/28
2019/6/21 13:00 -
Participants:
BS baffle review
Progress report
Type-A (Takahashi)
Past week report
[Okutomi]
- Monitored the drift of the IP and GAS displacements of the ETMY during the air injection.
- Tried to offload the DC output to the F3 GAS actuator with the FR, but it resulted that the stepper motor seems stuck.
- The ETMY chamber is in air pressure.
Plan for coming weeks
- CRY team will recover the problem of the ETMY payload in 28-30th.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- Auto-offload for GAS script is available from medm.
- Summarizing information in wiki page.
- Checking PR3 and PRM Traverser drivers
- Actually PR3 driver is healthy according to Enomoto-kun, but R2 motor connection is found to be dead last week.
- For PRM driver, PLC is working at least. We need 5-phase motors for the test. (I have only 2-phase one now.)
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Modification parts are under manufacturing.
- Making the overall 3D model around OMC.
Plan for coming weeks
- Considering the delivery time of OSTM itself, the installation work at the site will be available in September.
Schedule was updated (PDF/MPP).
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
- PRM removal
Travel Plans
- Travel (Week of 7/1):
- Takahashi: 1-2
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
- Travel (Week of 7/8):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
Next meeting
On 2019/7/5(Fri)