Differences between revisions 3 and 4
Revision 3 as of 2019-06-27 11:42:01
Size: 1354
Comment:
Revision 4 as of 2019-06-27 11:44:13
Size: 1402
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:
 * Modification parts are under manufacturing.

Agenda/Minutes of the VIS Meeting on 2019/6/28

2019/6/21 13:00 -

Zoom Meeting

Participants:

BS baffle review

Progress report

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Modification parts are under manufacturing.
  • Making the overall 3D model around OMC.

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

  • PRM removal

Travel Plans

  • Travel (Week of 7/1):
    • Takahashi: 1-2
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
    • Terrence:
  • Travel (Week of 7/8):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
    • Terrence:

Next meeting

On 2019/7/5(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190628 (last edited 2019-06-28 15:54:15 by YoichiAso)