Agenda/Minutes of the VIS Meeting on 2019/6/28
2019/6/21 13:00 -
Participants:
BS baffle review
Progress report
Type-A (Takahashi)
Past week report
[Okutomi]
- Monitored the drift of the IP and GAS displacements of the ETMY during the air injection.
- Tried to offload the DC output to the F3 GAS actuator with the FR, but it resulted that the stepper motor seems stuck.
- The ETMY chamber is in air pressure.
Plan for coming weeks
- CRY team will recover the problem of the ETMY payload in 28-30th.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- Auto-offload for GAS script is available from medm.
- Summarizing information in wiki page.
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Modification parts are under manufacturing.
- Making the overall 3D model around OMC.
Plan for coming weeks
- Considering the delivery time of OSTM itself, the installation work at the site will be available in September.
Schedule was updated (PDF/MPP).
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
- PRM removal
Travel Plans
- Travel (Week of 7/1):
- Takahashi: 1-2
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
- Travel (Week of 7/8):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
Next meeting
On 2019/7/5(Fri)