Comment:
|
1993
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2019/7/5 13:00 - |
2019/7/5 13:00 - |
Line 12: | Line 11: |
* Confirmed the LVDT polarities in Y-end (6/30). * Installed the Type-A guardians (6/30). * Measured the cryo-payload spectra (6/30). * Aligned the TM/MN OpLevs in Y-front (7/2). |
|
Line 13: | Line 17: |
=== Type B (Mark) === |
=== Type B (Mark) (Written by Fabian) === |
Line 17: | Line 20: |
=== Type-Bp (Shoda) === * Checked the Traverser drivers work properly with Uraguchi-san's motors. * PR3 driver is alive from the beginning, and the PRM driver was not active since the switch of the PLC was in the wrong mode. * I changed the wire connection of the PR3 driver to have the same configuration with others. I will send the drivers with adapter cables for the PR3 to match the connection. |
|
Line 18: | Line 25: |
=== Type-Bp (Shoda) === | |
Line 21: | Line 27: |
=== OMMT & OSTM (Takahashi) === ==== Past week report ==== * The modification parts have been delivered. * Pre-assembled the suspension with the modification parts. * Checked the mirror gluing jig at the site. Since the dimensions of mirror is different from the IMC ones, it is necessary to modify some spacers. * There are two stand-offs with sharp notch. No spare. |
|
Line 22: | Line 34: |
=== OMMT & OSTM === ==== Past week report ==== |
|
Line 25: | Line 35: |
* Transport the suspension to Kamioka. | |
Line 29: | Line 40: |
Line 31: | Line 41: |
Line 36: | Line 45: |
* Type-A: | * Type-A: |
Line 40: | Line 49: |
Line 43: | Line 51: |
* Takahashi: * Sato: * Hirata: |
* Takahashi: * Sato: * Hirata: |
Line 47: | Line 55: |
* Fujii: | * Fujii: |
Line 52: | Line 60: |
* Takahashi: * Sato: * Hirata: |
* Takahashi:16-19 * Sato: * Hirata: |
Line 56: | Line 64: |
* Fujii: | * Fujii: |
Agenda/Minutes of the VIS Meeting on 2019/7/5
2019/7/5 13:00 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
- Confirmed the LVDT polarities in Y-end (6/30).
- Installed the Type-A guardians (6/30).
- Measured the cryo-payload spectra (6/30).
Aligned the TM/MN OpLevs in Y-front (7/2).
Plan for coming weeks
Type B (Mark) (Written by Fabian)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
- Checked the Traverser drivers work properly with Uraguchi-san's motors.
- PR3 driver is alive from the beginning, and the PRM driver was not active since the switch of the PLC was in the wrong mode.
- I changed the wire connection of the PR3 driver to have the same configuration with others. I will send the drivers with adapter cables for the PR3 to match the connection.
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- The modification parts have been delivered.
- Pre-assembled the suspension with the modification parts.
- Checked the mirror gluing jig at the site. Since the dimensions of mirror is different from the IMC ones, it is necessary to modify some spacers.
- There are two stand-offs with sharp notch. No spare.
Plan for coming weeks
- Transport the suspension to Kamioka.
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 7/8):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
- Travel (Week of 7/15):
Takahashi:16-19
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
Next meeting
On 2019/7/12(Fri)