Line 10: | Line 10: |
=== Type-A === | === Type-A (Takahashi) === |
Line 12: | Line 12: |
* Updated the Real-time model & medm for the Type-A payload. * The direct feedback paths from TM OpLev to the upper stages are reimplemented. * The generic feedback path (OLSERVO, so-called band-path comb paths) updates: * The number of channels increased: 12ch -> 24 ch * The output paths increased: only (L, P, Y) DoFs -> all controllable DoFs in the payload * Driving matrices have been separated for each of local-based and global-based signals. * Decoupling matrices for the photo-reflective sensors have been prepared. * The diagonalization of these matrices is not implemented yet. We'll do at the moment of necessity. * DAQ channel reduction is reflected on the current running models. * We found that the DAQ assignment on the channels TM_OPLEV_TILT_(PIT/YAW)_OUT is accidentally disabled. -> recovered. * The messy overview screen was rearranged. * Damping filter implementation on the payload is ongoing. (Okutomi, Yamada) * We started with measuring mechanical transfer functions and checked the filters which are currently implemented. * With the great effort of Fujii-kun and many commissioners, the current filters seem working well as far as we investigated (ITMY and ETMY) * We are going to investigate the left parts to understand the situation. * Study on the deformation of base plate in the GAS filter with the ATC staff. |
|
Line 14: | Line 30: |
=== Type B === | === Type-B === |
Line 22: | Line 38: |
=== OMMT & OSTM === | === OMMT & OSTM (Takahashi) === |
Line 24: | Line 40: |
* Asking quotations for the modification parts in the mirror gluing jig and the standoff. * Preparing for shipping of the suspension. * The mirror will be ready in October. |
|
Line 25: | Line 44: |
* Test the OSEMs at the site. * Confirm some dimensions on the present OMMT/OSTM suspensions. |
|
Line 35: | Line 56: |
* Foreseen risks * Type-A: * Type-B: |
|
Line 40: | Line 57: |
* VIS talk slots at the August F2F | |
Line 43: | Line 61: |
* Takahashi: | * Takahashi: 16-19 |
Agenda/Minutes of the VIS Meeting on 2019/7/12
2019/7/12 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
Updated the Real-time model & medm for the Type-A payload.
The direct feedback paths from TM OpLev to the upper stages are reimplemented.
- The generic feedback path (OLSERVO, so-called band-path comb paths) updates:
- Driving matrices have been separated for each of local-based and global-based signals.
- Decoupling matrices for the photo-reflective sensors have been prepared.
- The diagonalization of these matrices is not implemented yet. We'll do at the moment of necessity.
- DAQ channel reduction is reflected on the current running models.
We found that the DAQ assignment on the channels TM_OPLEV_TILT_(PIT/YAW)_OUT is accidentally disabled. -> recovered.
- The messy overview screen was rearranged.
- Damping filter implementation on the payload is ongoing. (Okutomi, Yamada)
- We started with measuring mechanical transfer functions and checked the filters which are currently implemented.
- With the great effort of Fujii-kun and many commissioners, the current filters seem working well as far as we investigated (ITMY and ETMY)
- We are going to investigate the left parts to understand the situation.
- Study on the deformation of base plate in the GAS filter with the ATC staff.
Plan for coming weeks
Type-B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Asking quotations for the modification parts in the mirror gluing jig and the standoff.
- Preparing for shipping of the suspension.
- The mirror will be ready in October.
Plan for coming weeks
- Test the OSEMs at the site.
- Confirm some dimensions on the present OMMT/OSTM suspensions.
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
- VIS talk slots at the August F2F
Travel Plans
- Travel (Week of 7/15):
- Takahashi: 16-19
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
- Travel (Week of 7/22):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
Next meeting
On 2019/7/19(Fri)