Line 10: | Line 10: |
=== Type-A === | === Type-A (Takahashi) === |
Line 12: | Line 12: |
* Updated the Real-time model & medm for the Type-A payload. * Study on the deformation of base plate in the GAS filter with the ATC staff. |
|
Line 14: | Line 16: |
=== Type B === | === Type-B === |
Line 22: | Line 24: |
=== OMMT & OSTM === | === OMMT & OSTM (Takahashi) === |
Line 24: | Line 26: |
* Asking quotations for the modification parts in the mirror gluing jig and the standoff. * Preparing for shipping of the suspension. * The mirror will be ready in October. |
|
Line 25: | Line 30: |
* Test the OSEMs at the site. * Confirm some dimensions on the present OMMT/OSTM suspensions. |
|
Line 34: | Line 41: |
* Foreseen risks * Type-A: * Type-B: |
Agenda/Minutes of the VIS Meeting on 2019/7/12
2019/7/12 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
Updated the Real-time model & medm for the Type-A payload.
- Study on the deformation of base plate in the GAS filter with the ATC staff.
Plan for coming weeks
Type-B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Asking quotations for the modification parts in the mirror gluing jig and the standoff.
- Preparing for shipping of the suspension.
- The mirror will be ready in October.
Plan for coming weeks
- Test the OSEMs at the site.
- Confirm some dimensions on the present OMMT/OSTM suspensions.
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
Travel Plans
- Travel (Week of 7/15):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
- Travel (Week of 7/22):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
Next meeting
On 2019/7/19(Fri)