Differences between revisions 2 and 3
Revision 2 as of 2019-07-11 22:17:45
Size: 964
Editor: YoichiAso
Comment:
Revision 3 as of 2019-07-12 09:11:25
Size: 1108
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * Updated the Real-time model & medm for the Type-A payload.
 * Study on the deformation of base plate in the GAS filter with the ATC staff.

Agenda/Minutes of the VIS Meeting on 2019/7/12

2019/7/12 13:30 -

Zoom Meeting

Participants:

Progress report

Type-A

Past week report

  • Updated the Real-time model & medm for the Type-A payload.

  • Study on the deformation of base plate in the GAS filter with the ATC staff.

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 7/15):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
    • Terrence:
  • Travel (Week of 7/22):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
    • Terrence:

Next meeting

On 2019/7/19(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190712 (last edited 2019-07-12 14:45:51 by YoichiAso)