Differences between revisions 4 and 5
Revision 4 as of 2019-07-12 09:17:24
Size: 1399
Comment:
Revision 5 as of 2019-07-12 09:18:21
Size: 1411
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
=== Type-A === === Type-A (Takahashi) ===
Line 16: Line 16:
=== Type B === === Type-B ===

Agenda/Minutes of the VIS Meeting on 2019/7/12

2019/7/12 13:30 -

Zoom Meeting

Participants:

Progress report

Type-A (Takahashi)

Past week report

  • Updated the Real-time model & medm for the Type-A payload.

  • Study on the deformation of base plate in the GAS filter with the ATC staff.

Plan for coming weeks

Type-B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Asking quotations for some modification parts for the mirror gluing jig and the standoff.
  • Preparing for shipping of the suspension.
  • The mirror will be ready in October.

Plan for coming weeks

  • Test the OSEMs at the site.
  • Confirm some dimensions on the present OMMT/OSTM suspensions.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 7/15):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
    • Terrence:
  • Travel (Week of 7/22):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
    • Terrence:

Next meeting

On 2019/7/19(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190712 (last edited 2019-07-12 14:45:51 by YoichiAso)