Agenda/Minutes of the VIS Meeting on 2019/7/12
2019/7/12 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
Updated the Real-time model & medm for the Type-A payload.
- Study on the deformation of base plate in the GAS filter with the ATC staff.
Plan for coming weeks
Type-B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Asking quotations for the modification parts in the mirror gluing jig and the standoff.
- Preparing for shipping of the suspension.
- The mirror will be ready in October.
Plan for coming weeks
- Test the OSEMs at the site.
- Confirm some dimensions on the present OMMT/OSTM suspensions.
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
Travel Plans
- Travel (Week of 7/15):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
- Travel (Week of 7/22):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Terrence:
Next meeting
On 2019/7/19(Fri)