⇤ ← Revision 1 as of 2019-07-24 17:21:10
Size: 932
Comment:
|
Size: 1154
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
* Going to the control test of the ITMX/ETMX Suspension for WFS. | |
Line 22: | Line 23: |
=== OMMT & OSTM === | === OMMT & OSTM (Takahashi) === |
Line 24: | Line 25: |
* The standoffs have been delivered. Inspecting the sharpness of notch. * Designing the bottom spacer and the D-sub anchor. |
|
Line 39: | Line 43: |
* Takahashi: | * Takahashi: (Vacation) |
Line 47: | Line 51: |
* Takahashi: | * Takahashi: 6-8 |
Agenda/Minutes of the VIS Meeting on 2019/7/26
2019/7/26 14:00 -
Participants:
Progress report
Type-A
Past week report
- Going to the control test of the ITMX/ETMX Suspension for WFS.
Plan for coming weeks
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- The standoffs have been delivered. Inspecting the sharpness of notch.
- Designing the bottom spacer and the D-sub anchor.
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
Travel Plans
- Travel (Week of 7/29):
- Takahashi: (Vacation)
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 8/5):
- Takahashi: 6-8
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2019/8/2(Fri)