 * Going to the control test of the ITMX/ETMX Suspension for WFS.
Line 22: Line 23:
=== OMMT & OSTM === === OMMT & OSTM (Takahashi) ===
Line 24: Line 25:
 * The standoffs have been delivered. Inspecting the sharpness of notch.
 * Designing the bottom spacer and the D-sub anchor.
Line 39: Line 43:
  * Takahashi:   * Takahashi: (Vacation)
Line 47: Line 51:
  * Takahashi:   * Takahashi: 6-8

Agenda/Minutes of the VIS Meeting on 2019/7/26

2019/7/26 14:00 -

Zoom Meeting

Participants:

Progress report

Type-A

Past week report

  • Going to the control test of the ITMX/ETMX Suspension for WFS.

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • The standoffs have been delivered. Inspecting the sharpness of notch.
  • Designing the bottom spacer and the D-sub anchor.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 7/29):
    • Takahashi: (Vacation)
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 8/5):
    • Takahashi: 6-8
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/8/2(Fri)