Agenda/Minutes of the VIS Meeting on 2019/7/26
2019/7/26 14:00 -
Participants:
Progress report
Type-A
Past week report
- Moved the SF/BF prototypes from the warehouse of TAMA to the ATC as the references for new design. Opened the cups and then found that the blades in the oldest prototype were broken.
Plan for coming weeks
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- The standoffs have been delivered. Inspecting the sharpness of notch.
- Designing the bottom spacer and the connector plate.
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
Travel Plans
- Travel (Week of 7/29):
- Takahashi: (Vacation)
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 8/5):
- Takahashi: 6-8
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2019/8/2(Fri)