Line 2: | Line 2: |
2019/8/16 14:00 - |
2019/8/16 14:00 - |
Line 12: | Line 11: |
* For the 150mHz-ish mode damping * sensor correction for IP, i.e., seismic signal subtraction system, was implemented to all the type-A suspensions. * BF-L/T damping was also implemented for this damping. * The RMS was suppressed by a factor of like 2.7, log [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9961|9961]] * (SC at IP) + (BF-L/T) made the system quieter compared to the previous, however, it was not enough * IP-TF does not have the peak at 150mHz-ish. * BF-actuation efficiency is not so high. * => we will try to the feedback like BFl to IPL, or TML to IPL, for the next. * For this purpose, we have to modify the model again. * For inertial damping performance test, LVDT damping vs. inertial damping > By Lucia * ETMY: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9981|9981]] * ITMX: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9995|9995]] * What is the summary for this week? * length-oplev calibration with green lock * log: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9989|9989]] * 1st trial. The values are *NOT* installed to the MEDM since we could not guarantee if we were observing TML motion not TMY motion. It looks they are not terrible values, compared to ground motion though. * F3-GAS of EY: looks stacked again * log at 2019 Aug. 15th, when it was stuck: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9990|9990]] * log at 2019 Aug. 15th, when it was free: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9293|9293]] * The difference between the above is like about 405um (it went to lower position), based on GAS_LVDTINF_OUT channel. * ETMY health check * lopg: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9996|9996]] => status and plan? * Listed up the modification parts in the 3D CAD model. |
|
Line 13: | Line 41: |
* Guardian stuff * utilize the TMY to BFY loop again, etc. * RTmodel modification * make paths from TM to IPL, BFL to IPL. * 150mHz-ish suppression * implement loops like TM to IP. |
|
Line 15: | Line 49: |
==== Past week report ==== ==== Plan for coming weeks ==== |
==== Report for the week 15-08-2019 ==== * Shoda-san improved the SR3 optic yaw motion (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9949|9949]]). * Improvement in the frequency band from 1 Hz to 2.3 Hz was achieved by modifying the IM-Y filter. The problem was not enough phase margin. * There's still a peak at 1.3 Hz. * She also modified the IM SENSALIGN matrix (diagonalization according to resonance peaks?) * Transfer functions should be measured again. * The BS optic has a large peak at 150 mHz (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9991|9991]]). ==== Plan for the week 19-08-2019 ==== * Enomoto-kun requested to extend the oplev control loop down to where the micro-seismic peak is. (Fabian.) * Assemsment of the motion of the SR optics around the micro-seimic region. (Due today.) |
Line 21: | Line 64: |
=== OMMT & OSTM (Takahashi) === ==== Past week report ==== * Ordered the dummy mirror to be used for gluing test. |
|
Line 22: | Line 68: |
=== OMMT & OSTM === ==== Past week report ==== |
|
Line 25: | Line 69: |
Line 29: | Line 72: |
Line 31: | Line 73: |
Line 36: | Line 77: |
* For the people in Kamioka, checking the presence/absence at the site will help us (not only for Mitaka persons). | |
Line 39: | Line 81: |
* Takahashi: * Sato: * Hirata: |
* Takahashi: 22-24(F2F) * Sato: * Hirata: |
Line 43: | Line 85: |
* Fujii: | * Fujii: 19-24 |
Line 45: | Line 87: |
* Fabian: 22-24(F2F) | |
Line 47: | Line 90: |
* Takahashi: * Sato: * Hirata: |
* Takahashi: * Sato: * Hirata: |
Line 51: | Line 94: |
* Fujii: * Tanaka: |
* Fujii: 26-30 * Tanaka: 26-30 |
Line 55: | Line 98: |
On 2019/8/29(Fri) | On 2019/8/30(Fri) |
Agenda/Minutes of the VIS Meeting on 2019/8/16
2019/8/16 14:00 -
Participants:
Progress report
Type-A
Past week report
- For the 150mHz-ish mode damping
- sensor correction for IP, i.e., seismic signal subtraction system, was implemented to all the type-A suspensions.
- BF-L/T damping was also implemented for this damping.
The RMS was suppressed by a factor of like 2.7, log 9961
- (SC at IP) + (BF-L/T) made the system quieter compared to the previous, however, it was not enough
- IP-TF does not have the peak at 150mHz-ish.
- BF-actuation efficiency is not so high.
=> we will try to the feedback like BFl to IPL, or TML to IPL, for the next.
- For this purpose, we have to modify the model again.
For inertial damping performance test, LVDT damping vs. inertial damping > By Lucia
- length-oplev calibration with green lock
log: 9989
- 1st trial. The values are *NOT* installed to the MEDM since we could not guarantee if we were observing TML motion not TMY motion. It looks they are not terrible values, compared to ground motion though.
- F3-GAS of EY: looks stacked again
- ETMY health check
lopg: 9996 => status and plan?
- Listed up the modification parts in the 3D CAD model.
Plan for coming weeks
- Guardian stuff
- utilize the TMY to BFY loop again, etc.
- RTmodel modification
- make paths from TM to IPL, BFL to IPL.
- 150mHz-ish suppression
- implement loops like TM to IP.
Type B
Report for the week 15-08-2019
Shoda-san improved the SR3 optic yaw motion (klog 9949).
- Improvement in the frequency band from 1 Hz to 2.3 Hz was achieved by modifying the IM-Y filter. The problem was not enough phase margin.
- There's still a peak at 1.3 Hz.
- She also modified the IM SENSALIGN matrix (diagonalization according to resonance peaks?)
- Transfer functions should be measured again.
The BS optic has a large peak at 150 mHz (klog 9991).
Plan for the week 19-08-2019
- Enomoto-kun requested to extend the oplev control loop down to where the micro-seismic peak is. (Fabian.)
- Assemsment of the motion of the SR optics around the micro-seimic region. (Due today.)
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Ordered the dummy mirror to be used for gluing test.
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
- For the people in Kamioka, checking the presence/absence at the site will help us (not only for Mitaka persons).
Travel Plans
- Travel (Week of 8/19):
- Takahashi: 22-24(F2F)
- Sato:
- Hirata:
- Shoda:
- Fujii: 19-24
- Tanaka:
- Fabian: 22-24(F2F)
- Travel (Week of 8/26):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii: 26-30
- Tanaka: 26-30
Next meeting
On 2019/8/30(Fri)