= Agenda/Minutes of the VIS Meeting on 2019/8/16 = 2019/8/16 14:00 - 15:30 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Takahashi, Fabian, Aso, Tanaka, Ishizaki, Lucia, Fujii, Miyo, Shoda == Progress report == === Type-A === ==== Past week report ==== * For the 150mHz-ish mode damping * sensor correction for IP, i.e., seismic signal subtraction system, was implemented to all the type-A suspensions. * BF-L/T damping was also implemented for this damping. * The RMS was suppressed by a factor of like 2.7, log [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9961|9961]] * (SC at IP) + (BF-L/T) made the system quieter compared to the previous, however, it was not enough * IP-TF does not have the peak at 150mHz-ish. * BF-actuation efficiency is not so high. * => we will try to the feedback like BFl to IPL, or TML to IPL, for the next. * For this purpose, we have to modify the model again. * For inertial damping performance test, LVDT damping vs. inertial damping > By Lucia * ETMY: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9981|9981]] * ITMX: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9995|9995]] * What is the summary for this week? * length-oplev calibration with green lock * log: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9989|9989]] * 1st trial. The values are *NOT* installed to the MEDM since we could not guarantee if we were observing TML motion not TMY motion. It looks they are not terrible values, compared to ground motion though. * F3-GAS of EY: looks stacked again * log at 2019 Aug. 15th, when it was stuck: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9990|9990]] * log at 2019 Aug. 15th, when it was free: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9293|9293]] * The difference between the above is like about 405um (it went to lower position), based on GAS_LVDTINF_OUT channel. * ETMY health check * lopg: [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9996|9996]] => status and plan? * Listed up the modification parts in the 3D CAD model. ==== Plan for coming weeks ==== * Guardian stuff * utilize the TMY to BFY loop again, etc. * RTmodel modification * make paths from TM to IPL, BFL to IPL. * 150mHz-ish suppression * implement loops like TM to IP. === Type B === ==== Report for the week 15-08-2019 ==== * Shoda-san improved the SR3 optic yaw motion (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9949|9949]]). * Improvement in the frequency band from 1 Hz to 2.3 Hz was achieved by modifying the IM-Y filter. The problem was not enough phase margin. * There's still a peak at 1.3 Hz. * She also modified the IM SENSALIGN matrix (diagonalization according to resonance peaks?) * Transfer functions should be measured again. * The BS optic has a large peak at 150 mHz (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9991|9991]]). ==== Plan for the week 19-08-2019 ==== * Enomoto-kun requested to extend the oplev control loop down to where the micro-seismic peak is. (Fabian.) * Assemsment of the motion of the SR optics around the micro-seimic region. (Due today.) === Type-Bp === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Takahashi) === ==== Past week report ==== * Ordered the dummy mirror to be used for gluing test. ==== Plan for coming weeks ==== === VIS electronics === ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: == Discussion == * For the people in Kamioka, checking the presence/absence at the site will help us (not only for Mitaka persons). == Travel Plans == * Travel (Week of 8/19): * Takahashi: 22-24(F2F) * Sato:  * Hirata: * Shoda: * Fujii: 19-24 * Tanaka: * Fabian: 22-24(F2F) * Travel (Week of 8/26): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: 26-30 * Tanaka: 26-30 == Next meeting == On 2019/8/30(Fri)