 * Updated the list of the modification parts in the 3D CAD model.
Line 22: Line 23:
=== OMMT & OSTM === === OMMT & OSTM (Takahashi) ===
Line 24: Line 25:
 * Evaluating the M2052 sample bar for OMC.

Agenda/Minutes of the VIS Meeting on 2019/9/6

2019/9/6 15:00 -

Zoom Meeting

Participants:

Progress report

Type-A

Past week report

  • Updated the list of the modification parts in the 3D CAD model.

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Evaluating the M2052 sample bar for OMC.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Continued discussion on the VIS repair/upgrade work between O3 and O4

Travel Plans

  • Travel (Week of 9/9):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 9/16):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/9/13(Fri)