Agenda/Minutes of the VIS Meeting on 2019/9/6
2019/9/6 15:00 -
Participants:
Progress report
Type-A
Past week report
- Updated the list of the modification parts in the 3D CAD model.
- With Miyo-kun, we implemented sensor correction filter to IP-LVDT using the following sensors:
- local seismometers on ground at EXV and IXV
- GIF strain meter (This signal was fed back to only ETMX)
- simulation tools for Type-A control are now being prepared.
- /kagra/Dropbox/Personal/Fujii/TypeA/simulation/TypeAsimctrl_190902.slx
- Still some of the paths are not connected
- Soon the suspension ss-model is to be tuned especially about vertical resonances.
Plan for coming weeks
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Evaluating the M2052 sample bar for OMC.
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
- Continued discussion on the VIS repair/upgrade work between O3 and O4
Travel Plans
- Travel (Week of 9/9):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 9/16):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2019/9/13(Fri)