= Agenda/Minutes of the VIS Meeting on 2019/9/13 = 2019/9/13 14:00 - [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: == Progress report == === Type-A === ==== Past week report ==== ==== Plan for coming weeks ==== === Type B === ==== Report for the week 13-09-2019 ==== * In previous weeks we identified injected noise into the SR3 IM from the oplev (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10262|10262]]). On Monday I put notches at various frequencies where there were peaks (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10423|10423]]). This procedure seems to work but it's tedious and we should do it in an as-needed depending on the impact of each peak in the interferometer signal. * Shoda-san and Terrence began been working in IM-L to IM-P and IM-Y filters (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10505|10505]]). * In a previuos week I modified the SR2 real-time model in order to do LVDT correction with the seismometer signals. This week was mainly troubleshooting and preparation: * We found a couple of errors in the real-time model (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10460|10460]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10509|10509]]). * Miyo-kun added ati-aliasing filter at the output of the PEM real-time model before the Dolphin network. * An integrator is needed for the seismometer signal in order to get a displacement. However, the automatically generated medm screen points to a different filter bank (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10510|10510]]). This hasn't been fixed yet. * Still, I measured transfer functions from seismometer on the ground to IP LVDT in FLOAT state, data which can be corrected (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10510|10510]]). * In SR2 the cables connecting the BIO output from the coil drivers to the DIO card inside the I/O chassis were connected in a wrong way. I fixed them (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10464|10464]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10508|10508]]). ==== Plan for coming week ==== * Terrence and Shoda-san will work in IM-L to TM angular decoupling. * After decoupling IP LVDT sensor correction is the priority. === Type-Bp === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Takahashi) === ==== Past week report ==== * Evaluating the M2052 sample bar for OMC. ==== Plan for coming weeks ==== === VIS electronics === ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: == Discussion == * Continued discussion on the VIS repair/upgrade work between O3 and O4 == Travel Plans == * Travel (Week of 9/16): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: 14 or 15 - 30 * Tanaka: * Fabian: JPS * Okutomi: JPS * Travel (Week of 9/23): * Takahashi: * Sato: * Hirata: * Shoda: Vacation: 9/26 - 10/1 * Fujii: * Tanaka: == Next meeting == On 2019/9/20(Fri)