Line 26: Line 26:
=== OMMT & OSTM === === OMMT & OSTM (Takahashi) ===
Line 28: Line 28:
 * Evaluating the M2052 sample bar for OMC.
Line 29: Line 30:
 * Schedule was revised ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10364|pdf/mpp]]).
 * Go to assembly and test of the OSTM suspension using the dummy mirror in 15-18th October.
Line 44: Line 47:
  * Takahashi:   * Takahashi: 10/3-4

Agenda/Minutes of the VIS Meeting on 2019/9/27

2019/9/27 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Evaluating the M2052 sample bar for OMC.

Plan for coming weeks

  • Schedule was revised (pdf/mpp).

  • Go to assembly and test of the OSTM suspension using the dummy mirror in 15-18th October.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Continued discussion on the VIS repair/upgrade work between O3 and O4

Travel Plans

  • Travel (Week of 9/30):
    • Takahashi: 10/3-4
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 10/7):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/10/11(Fri)