Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2019-09-25 15:53:04
Size: 1285
Editor: YoichiAso
Comment:
Revision 5 as of 2019-09-27 12:11:53
Size: 2562
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

2019/9/27 14:00 - 
2019/9/27 14:00 -
Line 11: Line 10:
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file%2cxlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]]
Line 17: Line 16:
=== Type B ===
Line 18: Line 18:
=== Type B ===
==== Past week report ====
==== Plan for coming weeks ====
==== Report for the week 23-09-2019 ====
 * Terrence modified the real-time model in order to accomodate hierarchical actuation from the interferometer sensing and control system (ISC). The modified model has not been installed. See klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10692|10692]].
 * In previous meetings it was reported there was a problem with the medm screen or real-time model in the components related to IP LVDT correction with the seismometer signal. In reality a trivial operation was still required. The apparent problem has been fixed now and we can proceed to implement the sensor correction in SR2 when we have the time.

==== Plan for next week ====
 * If we have the time it would be good to implement the sensor correction at least in the BS and test it in bad weather conditions.
 * Commit the changes that Terrence made to the real-time model.

==== Vacation/Travel Info ====
Friday next week late in the afternoon we have the KAGRA ceremony.

Line 25: Line 34:
=== OMMT & OSTM (Takahashi) ===
==== Past week report ====
 * Designing the clamp to fix the M2052 bar on the OMC plate.
 * Evaluating the M2052 sample bar for OMC.
Line 26: Line 39:
=== OMMT & OSTM ===
==== Past week report ====
Line 29: Line 40:
 * Schedule was revised ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10364|pdf/mpp]]).
 * Go to assembly and test of the OSTM suspension using the dummy mirror in 15-18th October.
Line 33: Line 46:
Line 35: Line 47:
Line 44: Line 55:
  * Takahashi:
  * Sato: 
  * Hirata: 
  * Takahashi: 10/3-4
  * Sato:
  * Hirata:
Line 48: Line 59:
  * Fujii:    * Fujii:
Line 52: Line 63:
  * Takahashi: 
  * Sato:
  * Hirata: 
  * Takahashi:
  * Sato: 9 (Kashiwa)
  * Hirata:
Line 56: Line 67:
  * Fujii:    * Fujii:

Agenda/Minutes of the VIS Meeting on 2019/9/27

2019/9/27 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Report for the week 23-09-2019

  • Terrence modified the real-time model in order to accomodate hierarchical actuation from the interferometer sensing and control system (ISC). The modified model has not been installed. See klog entry 10692.

  • In previous meetings it was reported there was a problem with the medm screen or real-time model in the components related to IP LVDT correction with the seismometer signal. In reality a trivial operation was still required. The apparent problem has been fixed now and we can proceed to implement the sensor correction in SR2 when we have the time.

Plan for next week

  • If we have the time it would be good to implement the sensor correction at least in the BS and test it in bad weather conditions.
  • Commit the changes that Terrence made to the real-time model.

Vacation/Travel Info

Friday next week late in the afternoon we have the KAGRA ceremony.

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Designing the clamp to fix the M2052 bar on the OMC plate.
  • Evaluating the M2052 sample bar for OMC.

Plan for coming weeks

  • Schedule was revised (pdf/mpp).

  • Go to assembly and test of the OSTM suspension using the dummy mirror in 15-18th October.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Continued discussion on the VIS repair/upgrade work between O3 and O4

Travel Plans

  • Travel (Week of 9/30):
    • Takahashi: 10/3-4
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 10/7):
    • Takahashi:
    • Sato: 9 (Kashiwa)
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/10/11(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190927 (last edited 2019-09-27 14:31:08 by YoichiAso)