Differences between revisions 9 and 10
Revision 9 as of 2019-09-27 13:07:49
Size: 2753
Comment:
Revision 10 as of 2019-09-27 13:13:17
Size: 2845
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
- sc-performance check by YF.  * sc-performance check by YF.
https://github.com/YoshinoriFujii/Weekly-task/issues/23#issuecomment-535775755
 * GAS servofilter reshaping [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10695|klog#10695]]
Line 17: Line 19:
https://github.com/YoshinoriFujii/Weekly-task/issues/23#issuecomment-535775755

Agenda/Minutes of the VIS Meeting on 2019/9/27

2019/9/27 13:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

  • sc-performance check by YF.

https://github.com/YoshinoriFujii/Weekly-task/issues/23#issuecomment-535775755

Plan for coming weeks

  • measure decay time constants
  • check axis between IP and Xarm etc

Type B

Report for the week 23-09-2019

  • Terrence modified the real-time model in order to accomodate hierarchical actuation from the interferometer sensing and control system (ISC). The modified model has not been installed. See klog entry 10692.

  • In previous meetings it was reported there was a problem with the medm screen or real-time model in the components related to IP LVDT correction with the seismometer signal. In reality a trivial operation was still required. The apparent problem has been fixed now and we can proceed to implement the sensor correction in SR2 when we have the time.

Plan for next week

  • If we have the time it would be good to implement the sensor correction at least in the BS and test it in bad weather conditions.
  • Commit the changes that Terrence made to the real-time model.

Vacation/Travel Info

Friday next week late in the afternoon we have the KAGRA ceremony.

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Designing the clamp to fix the M2052 bar on the OMC plate.
  • Evaluating the M2052 sample bar for OMC.

Plan for coming weeks

  • Schedule was revised (pdf/mpp).

  • Go to assembly and test of the OSTM suspension using the dummy mirror in 15-18th October.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Continued discussion on the VIS repair/upgrade work between O3 and O4

Travel Plans

  • Travel (Week of 9/30):
    • Takahashi: 10/3-4
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 10/7):
    • Takahashi:
    • Sato: 9 (Kashiwa)
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/10/11(Fri)