= Agenda/Minutes of the VIS Meeting on 2019/9/27 = 2019/9/27 13:00 - 14:31 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: [[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--AlK26n6oP8QHU_XUQriwv2PvAg-RKcNXfMFrqOtTAPU48qQf|VIS Commissioning Task List]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] == Progress report == === Type-A === ==== Past week report ==== * sc-performance check by YF. https://github.com/YoshinoriFujii/Weekly-task/issues/23#issuecomment-535775755 * GAS servofilter reshaping [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10695|klog#10695]] ==== Plan for coming weeks ==== * measure decay time constants * check axis between IP and Xarm etc === Type B === ==== Report for the week 23-09-2019 ==== * Terrence modified the real-time model in order to accomodate hierarchical actuation from the interferometer sensing and control system (ISC). The modified model has not been installed. See klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10692|10692]]. * In previous meetings it was reported there was a problem with the medm screen or real-time model in the components related to IP LVDT correction with the seismometer signal. In reality a trivial operation was still required. The apparent problem has been fixed now and we can proceed to implement the sensor correction in SR2 when we have the time. ==== Plan for next week ==== * If we have the time it would be good to implement the sensor correction at least in the BS and test it in bad weather conditions. * Commit the changes that Terrence made to the real-time model. ==== Vacation/Travel Info ==== Friday next week late in the afternoon we have the KAGRA ceremony. === Type-Bp === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Takahashi) === ==== Past week report ==== * Designing the clamp to fix the M2052 bar on the OMC plate. * Evaluating the M2052 sample bar for OMC. ==== Plan for coming weeks ==== * Schedule was revised ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10364|pdf/mpp]]). * Go to assembly and test of the OSTM suspension using the dummy mirror in 15-18th October. === VIS electronics === ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: == Discussion == * Continued discussion on the VIS repair/upgrade work between O3 and O4 == Travel Plans == * Travel (Week of 9/30): * Takahashi: 10/3-4 * Sato: * Hirata: * Shoda: * Fujii: 10/2 * Tanaka: * Aso: Out of Kamioka 9/30 - 10/1 * Travel (Week of 10/7): * Takahashi: * Sato: 9 (Kashiwa) * Hirata: * Shoda: * Fujii: - 10/12 * Tanaka: == Next meeting == On 2019/10/11(Fri)