Line 26: Line 26:
=== OMMT & OSTM === === OMMT & OSTM (Takahashi) ===
Line 28: Line 28:
 * Disassembled the OSTM suspension, packed them, and sent to Kamioka.
Line 29: Line 30:
 * Schedule was revised ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10364|pdf/mpp]]).
 * Assembly and test of the OSTM suspension using the dummy mirror.

Agenda/Minutes of the VIS Meeting on 2019/10/11

2019/10/11 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Disassembled the OSTM suspension, packed them, and sent to Kamioka.

Plan for coming weeks

  • Schedule was revised (pdf/mpp).

  • Assembly and test of the OSTM suspension using the dummy mirror.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 10/14):
    • Takahashi:
    • Sato: 15-18
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 10/21):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/10/18(Fri)