⇤ ← Revision 1 as of 2019-10-24 22:50:16
Size: 1213
Comment:
|
Size: 1432
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 26: | Line 26: |
=== OMMT & OSTM === | === OMMT & OSTM (Takahashi) === |
Line 28: | Line 28: |
* Assembled the new OSTM suspension using the dummy mirror. At the first time, suspension length was too long by 1cm. It was corrected. | |
Line 29: | Line 30: |
* Test of the OSTM suspension is planed in the week of 11/4. | |
Line 51: | Line 53: |
* Takahashi: * Sato: |
* Takahashi: 5-7 * Sato: 5-7 |
Agenda/Minutes of the VIS Meeting on 2019/10/25
2019/10/25 14:00 -
Participants:
Progress report
Type-A
Past week report
Plan for coming weeks
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Assembled the new OSTM suspension using the dummy mirror. At the first time, suspension length was too long by 1cm. It was corrected.
Plan for coming weeks
- Test of the OSTM suspension is planed in the week of 11/4.
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
Travel Plans
- Travel (Week of 10/28):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 11/4):
- Takahashi: 5-7
- Sato: 5-7
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2019/11/1(Fri)