2019/10/25 14:00 - 
2019/10/25 14:00 -
Line 11: Line 10:
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file%2cxlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]]
Line 17: Line 16:
Line 20: Line 18:
I diagonalized the ASC degrees of freedom of the beam splitter using the oplev as a first approximation (klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11165|11165]]). When the wafefront sensor becomes available we will do it again.

 * Only low frequencies were considered. Actually I used DC offsets.
 * After the correction, between angular degrees of freedom we achieved 2% coupling and there was no coherence with length when briefly checking with transfer functions.
 * Because the coherence decreased at low frequecies after the correction if we want to further reduce the coupling at low frequencies we need to actuate with a line rather than with white noise.
Line 21: Line 25:
Line 25: Line 28:
=== OMMT & OSTM (Takahashi) ===
==== Past week report ====
 * Assembled the new OSTM suspension using the dummy mirror. At the first time, suspension length was too long by 1cm. It was corrected.
Line 26: Line 32:
=== OMMT & OSTM ===
==== Past week report ====
Line 29: Line 33:
 * Test of the OSTM suspension is planed in the week of 11/4.
Line 33: Line 38:
Line 35: Line 39:
Line 40: Line 43:
Line 43: Line 45:
  * Takahashi: 
  * Sato: 
  * Hirata: 
  * Takahashi:
  * Sato:
  * Hirata:
Line 47: Line 49:
  * Fujii:    * Fujii:
Line 51: Line 53:
  * Takahashi:
  * Sato:
  * Hirata: 
  * Takahashi: 5-7
  * Sato: 5-7
  * Hirata:
Line 55: Line 57:
  * Fujii:    * Fujii:

Agenda/Minutes of the VIS Meeting on 2019/10/25

2019/10/25 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

I diagonalized the ASC degrees of freedom of the beam splitter using the oplev as a first approximation (klog entry 11165). When the wafefront sensor becomes available we will do it again.

  • Only low frequencies were considered. Actually I used DC offsets.
  • After the correction, between angular degrees of freedom we achieved 2% coupling and there was no coherence with length when briefly checking with transfer functions.
  • Because the coherence decreased at low frequecies after the correction if we want to further reduce the coupling at low frequencies we need to actuate with a line rather than with white noise.

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Assembled the new OSTM suspension using the dummy mirror. At the first time, suspension length was too long by 1cm. It was corrected.

Plan for coming weeks

  • Test of the OSTM suspension is planed in the week of 11/4.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 10/28):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 11/4):
    • Takahashi: 5-7
    • Sato: 5-7
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/11/1(Fri)