Size: 1432
Comment:
|
Size: 2091
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2019/10/25 14:00 - |
2019/10/25 14:00 - |
Line 11: | Line 10: |
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file%2cxlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] | [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] |
Line 17: | Line 16: |
Line 20: | Line 18: |
I diagonalized the ASC degrees of freedom of the beam splitter using the oplev as a first approximation (klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11165|11165]]). When the wafefront sensor becomes available we will do it again. * Only low frequencies were considered. Actually I used DC offsets. * After the correction, between angular degrees of freedom we achieved 2% coupling and there was no coherence with length when briefly checking with transfer functions. * Because the coherence decreased at low frequecies after the correction if we want to further reduce the coupling at low frequencies we need to actuate with a line rather than with white noise. |
|
Line 21: | Line 25: |
Line 25: | Line 28: |
Line 29: | Line 31: |
Line 35: | Line 38: |
Line 37: | Line 39: |
Line 42: | Line 43: |
Line 45: | Line 45: |
* Takahashi: * Sato: * Hirata: |
* Takahashi: * Sato: * Hirata: |
Line 49: | Line 49: |
* Fujii: | * Fujii: |
Line 55: | Line 55: |
* Hirata: | * Hirata: |
Line 57: | Line 57: |
* Fujii: | * Fujii: |
Agenda/Minutes of the VIS Meeting on 2019/10/25
2019/10/25 14:00 -
Participants:
Progress report
Type-A
Past week report
Plan for coming weeks
Type B
Past week report
I diagonalized the ASC degrees of freedom of the beam splitter using the oplev as a first approximation (klog entry 11165). When the wafefront sensor becomes available we will do it again.
- Only low frequencies were considered. Actually I used DC offsets.
- After the correction, between angular degrees of freedom we achieved 2% coupling and there was no coherence with length when briefly checking with transfer functions.
- Because the coherence decreased at low frequecies after the correction if we want to further reduce the coupling at low frequencies we need to actuate with a line rather than with white noise.
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Assembled the new OSTM suspension using the dummy mirror. At the first time, suspension length was too long by 1cm. It was corrected.
Plan for coming weeks
- Test of the OSTM suspension is planed in the week of 11/4.
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
Travel Plans
- Travel (Week of 10/28):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 11/4):
- Takahashi: 5-7
- Sato: 5-7
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2019/11/1(Fri)