 * After the correction, between angular degrees of freedom we achieved 2% coupling and there was no coherence with length when briefly checking with transfer functions.  * After the correction, between angular degrees of freedom we achieved 2% coupling when checking with offsets and there was no coherence with length when briefly checking with transfer functions.
Line 23: Line 23:
 * It's still necessary to measure the whole set of crossed transfer functions.
Line 25: Line 26:
 * As pointed out above, measure crossed transfer function in the BS.
 * Do the same with SR suspensions beginning with SRM.

Agenda/Minutes of the VIS Meeting on 2019/10/25

2019/10/25 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

I diagonalized the ASC degrees of freedom of the beam splitter using the oplev as a first approximation (klog entry 11165). When the wafefront sensor becomes available we will do it again.

  • Only low frequencies were considered. Actually I used DC offsets.
  • After the correction, between angular degrees of freedom we achieved 2% coupling when checking with offsets and there was no coherence with length when briefly checking with transfer functions.
  • Because the coherence decreased at low frequecies after the correction if we want to further reduce the coupling at low frequencies we need to actuate with a line rather than with white noise.
  • It's still necessary to measure the whole set of crossed transfer functions.

Plan for coming weeks

  • As pointed out above, measure crossed transfer function in the BS.
  • Do the same with SR suspensions beginning with SRM.

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Assembled the new OSTM suspension using the dummy mirror. At the first time, suspension length was too long by 1cm. It was corrected.

Plan for coming weeks

  • Test of the OSTM suspension is planed in the week of 11/4.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 10/28):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 11/4):
    • Takahashi: 5-7
    • Sato: 5-7
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/11/1(Fri)