Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2019-11-01 09:47:25
Size: 1211
Editor: YoichiAso
Comment:
Revision 5 as of 2019-11-01 14:46:45
Size: 2470
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

2019/11/1 14:00 - 
2019/11/1 14:00 -
Line 11: Line 10:
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file%2cxlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]]
Line 17: Line 16:
Line 20: Line 18:
There were no activities in Type B this week because the suspensions were not available.
Line 21: Line 21:
Diagonalization of the ASC degrees of freedom for SRM and other SR suspensions if available.
Line 24: Line 25:
 * Kokeyama-san reported that the orientation of the mirror was incorrent in MISALIGNED state: the beam was not going into the beam dump and the beam was not going onto the PSD (see klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11260|11260]] and links thereir):
  * Against our expectations the beam goes ontt the PSD in ALIGNED state.
  * In such a state in order to misalign the mirror actuation was applied to test channels BF yaw, IM yaw and IM pitch and the output of the oplev DC control were frozen.
  * I found a new set of suitable offsets. See klog entry .
  * Fortunatelly in the new appropriate orientation the IM is closer to the SAFE, so nothing is expected to be touching.
  * Yamamoto-kun and I created a snapshot file for the MISALIGNED state usind the SDF and updated the new values.
Line 25: Line 33:
=== OMMT & OSTM (Takahashi) ===
==== Past week report ====
 * M2052 bars for OMC are under ECB process.
Line 26: Line 37:
=== OMMT & OSTM ===
==== Past week report ====
Line 29: Line 38:
 * Assembly and test of the OSTM suspension.
 * The mirror will be ready with the first contact.
Line 33: Line 44:
Line 35: Line 45:
Line 40: Line 49:
 * Time slots in the next F2F meeting: Request two slots (commissioning by Lucia and future plan by Takahashi)
Line 43: Line 53:
  * Takahashi:
  * Sato:
  * Hirata: 
  * Takahashi: 5-7
  * Sato: 5-7
  * Hirata:
Line 47: Line 57:
  * Fujii:    * Fujii:
Line 51: Line 61:
  * Takahashi: 
  * Sato: 
  * Hirata: 
  * Takahashi:
  * Sato:
  * Hirata:
Line 55: Line 65:
  * Fujii:    * Fujii:

Agenda/Minutes of the VIS Meeting on 2019/11/1

2019/11/1 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

There were no activities in Type B this week because the suspensions were not available.

Plan for coming weeks

Diagonalization of the ASC degrees of freedom for SRM and other SR suspensions if available.

Type-Bp

Past week report

  • Kokeyama-san reported that the orientation of the mirror was incorrent in MISALIGNED state: the beam was not going into the beam dump and the beam was not going onto the PSD (see klog entry 11260 and links thereir):

    • Against our expectations the beam goes ontt the PSD in ALIGNED state.
    • In such a state in order to misalign the mirror actuation was applied to test channels BF yaw, IM yaw and IM pitch and the output of the oplev DC control were frozen.
    • I found a new set of suitable offsets. See klog entry .
    • Fortunatelly in the new appropriate orientation the IM is closer to the SAFE, so nothing is expected to be touching.
    • Yamamoto-kun and I created a snapshot file for the MISALIGNED state usind the SDF and updated the new values.

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • M2052 bars for OMC are under ECB process.

Plan for coming weeks

  • Assembly and test of the OSTM suspension.
  • The mirror will be ready with the first contact.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Time slots in the next F2F meeting: Request two slots (commissioning by Lucia and future plan by Takahashi)

Travel Plans

  • Travel (Week of 11/4):
    • Takahashi: 5-7
    • Sato: 5-7
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 11/11):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/11/8(Fri)

KAGRA/Subgroups/VIS/VISMinutes20191101 (last edited 2019-11-01 15:02:59 by YoichiAso)