Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2019-11-07 19:31:16
Size: 1456
Comment:
Revision 5 as of 2019-11-08 13:35:03
Size: 1753
Editor: naohisa.sato
Comment:
Deletions are marked like this. Additions are marked like this.
Line 16: Line 16:
 * [[https://www.dropbox.com/s/9l1h0fw9kc1pzmm/Proocurement%202019FY.xlsx?dl=0|Procurement list in 2019FY]]
Line 32: Line 33:
 * Incidents: no incident  * Incidents:
Line 35: Line 36:
 * Time slots in the next F2F meeting: Request two slots (commissioning by Lucia and future plan by Takahashi)  * Status of GAS filter modification.
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10148|Memo to consider 40kg TM suspensions]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10869|Finite Element Analysis of pierced type GAS filter]]
Line 40: Line 43:
  * Sato:   * Sato: 14,15(Kashiwa)

Agenda/Minutes of the VIS Meeting on 2019/11/8

2019/11/8 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Finished the assembly of OSTM suspension with the dummy mirror.
  • Measured spectrum and transfer functions using the OSEMs.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 11/11):
    • Takahashi:
    • Sato: 14,15(Kashiwa)
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 11/18):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/11/15(Fri)