= Agenda/Minutes of the VIS Meeting on 2019/11/8 = 2019/11/8 14:00 - 16:00 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Takahashi, Fujii, Hirata, Tanaka, Sato, Ishizaki, Aso, Terrence, Lucia, Okutomi, Fabian [[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--AlK26n6oP8QHU_XUQriwv2PvAg-RKcNXfMFrqOtTAPU48qQf|VIS Commissioning Task List]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] == Progress report == === Type-A === ==== Past week report ==== * Recovery of GAS filter drift due to the temperature change. The heater control of chambers is planed. * Recovery of thermometer for the BF. ==== Plan for coming weeks ==== * [[https://www.dropbox.com/s/9l1h0fw9kc1pzmm/Proocurement%202019FY.xlsx?dl=0|Procurement list in 2019FY]] === Type B === ==== Past week report ==== The temperature has drifted in the BS clean booth. It has changed 0.8 degrees since October 10th. The top filter DC control signal is abovr 23,000 counts. See klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11423|11423]]. ==== Plan for coming weeks ==== The interferometer is the priority but we should continue with offline work: * Define new Guardian states for calm-down and obervation phases. * For the GAS filters DC control we still need to roll-off the filters at high frequencies in order to achive a suitable noise floor. === Type-Bp === ==== Past week report ==== Fabian changed the orientation of the mirror in misaligned state again. The beam wasn't really going into the beam dump according to Kokeyama-san. After the change it's very close to where it was before. See klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11377|11377]]. ==== Plan for coming weeks ==== === OMMT & OSTM (Takahashi) === ==== Past week report ==== * Finished the assembly of OSTM suspension with the dummy mirror. * Measured spectrum and transfer functions using the OSEMs. ==== Plan for coming weeks ==== === VIS electronics === ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: == Discussion == * Status of GAS filter modification. * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10148|Memo to consider 40kg TM suspensions]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10869|Finite Element Analysis of pierced type GAS filter]] == Travel Plans == * Travel (Week of 11/11): * Takahashi: * Sato: 14,15(Kashiwa) * Hirata: * Shoda: * Fujii: * Tanaka: * Travel (Week of 11/18): * Takahashi: * Sato: * Hirata: * Shoda: * Fujii: * Tanaka: == Next meeting == On 2019/11/15(Fri)