Size: 1519
Comment:
|
Size: 2146
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2019/11/15 14:00 - | 2019/11/15 13:30 - |
Line 6: | Line 6: |
Participants: | Participants: |
Line 10: | Line 10: |
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://www.dropbox.com/s/9l1h0fw9kc1pzmm/Proocurement%202019FY.xlsx?dl=0|Procurement list in 2019FY]] |
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://www.dropbox.com/s/9l1h0fw9kc1pzmm/Proocurement%202019FY.xlsx?dl=0|Procurement list in 2019FY]] |
Line 16: | Line 15: |
* Updated the Real-time model. * BF GAS filter in EY dropped by 100um due to the temparature variation. No change of performance were found. * Summarized the coil drivers by Yamamoto-san. |
|
Line 19: | Line 21: |
Information about Type B suspensions fishing rods were compiled [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/OpsManual/FishingRods|here]]. We stil need to compile the corresponding information from the other suspensions. |
|
Line 26: | Line 30: |
Line 28: | Line 33: |
Line 36: | Line 42: |
* Talk in JPS/ASJ meeting. | * Talk in JPS/ASJ meeting.: Fabian, Okutomi for JPS, Shoda for ASJ. |
Line 38: | Line 44: |
* About sliders for disassemby jig (Hirata, Shoda) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10989|slide]] | |
Line 51: | Line 58: |
* Hirata: | * Hirata: 27-28 |
Agenda/Minutes of the VIS Meeting on 2019/11/15
2019/11/15 13:30 -
Participants:
Post-O3 task list Procurement list in 2019FY
Progress report
Type-A
Past week report
- Updated the Real-time model.
- BF GAS filter in EY dropped by 100um due to the temparature variation. No change of performance were found.
- Summarized the coil drivers by Yamamoto-san.
Plan for coming weeks
Type B
Past week report
Information about Type B suspensions fishing rods were compiled here. We stil need to compile the corresponding information from the other suspensions.
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM
Past week report
- The OSTM mirror is ready with first-contact.
Plan for coming weeks
- Installation of the OSTM suspension is planed in the end of November.
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
- Talk in JPS/ASJ meeting.: Fabian, Okutomi for JPS, Shoda for ASJ.
- Requests for participating in LV(K) meeting in March 2020.
About sliders for disassemby jig (Hirata, Shoda) slide
Travel Plans
- Travel (Week of 11/18):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 11/25):
- Takahashi: 27-28
- Sato:
- Hirata: 27-28
- Shoda:
- Fujii:
- Tanaka:
Next meeting