Differences between revisions 6 and 11 (spanning 5 versions)
Revision 6 as of 2019-11-15 10:05:27
Size: 1815
Editor: AyakaShoda
Comment:
Revision 11 as of 2019-11-20 15:18:20
Size: 2234
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2019/11/15 14:00 - 2019/11/15 13:30 -
Line 6: Line 6:
Participants: Participants: Takahashi, Hirata, Shoda, Tanaka, Sato, Ishizaki, Aso, Terrence, Lucia, Okutomi, Fabian
Line 15: Line 15:
 * Updated the Real-time model.
 * BF GAS filter in EY dropped by 100um due to the temparature variation. No change of performance were found.
 * Summarized the coil drivers by Yamamoto-san.
Line 39: Line 42:
 * Talk in JPS/ASJ meeting.  * Talk in JPS/ASJ meeting.: Fabian, Okutomi for JPS, Shoda for ASJ.
Line 41: Line 44:
 * About sliders for disassemby jig (Hirata, Shoda)  * About sliders for disassemby jig (Hirata, Shoda) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10989|slide]]
Line 55: Line 58:
  * Hirata:   * Hirata: 27-28

Agenda/Minutes of the VIS Meeting on 2019/11/15

2019/11/15 13:30 -

Zoom Meeting

Participants: Takahashi, Hirata, Shoda, Tanaka, Sato, Ishizaki, Aso, Terrence, Lucia, Okutomi, Fabian

VIS Commissioning Task List

Post-O3 task list Procurement list in 2019FY

Progress report

Type-A

Past week report

  • Updated the Real-time model.
  • BF GAS filter in EY dropped by 100um due to the temparature variation. No change of performance were found.
  • Summarized the coil drivers by Yamamoto-san.

Plan for coming weeks

Type B

Past week report

Information about Type B suspensions fishing rods were compiled here. We stil need to compile the corresponding information from the other suspensions.

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

  • The OSTM mirror is ready with first-contact.

Plan for coming weeks

  • Installation of the OSTM suspension is planed in the end of November.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Talk in JPS/ASJ meeting.: Fabian, Okutomi for JPS, Shoda for ASJ.
  • Requests for participating in LV(K) meeting in March 2020.
  • About sliders for disassemby jig (Hirata, Shoda) slide

Travel Plans

  • Travel (Week of 11/18):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 11/25):
    • Takahashi: 27-28
    • Sato:
    • Hirata: 27-28
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/11/22(Fri)

KAGRA/Subgroups/VIS/VISMinutes20191115 (last edited 2019-11-20 15:18:20 by RyutaroTakahashi)