Size: 1447
Comment:
|
Size: 1860
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
Participants: | Participants: |
Line 15: | Line 15: |
* Shoda is working on the noise budgeting using the theoretical model. [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11638|klog]] Though it should be confirmed further, it will be applied on other suspensions. * Sato-san updated the 3D cad model for EXV. |
|
Line 20: | Line 23: |
Line 25: | Line 29: |
* Trouble of H1 coil in OMMT1? | |
Line 27: | Line 32: |
Line 35: | Line 41: |
* Status on the GAS filter modification. | * Guardian. See this [[https://www.dropbox.com/s/qnjz3ezz3vveo8u/GuardianTransition.pdf?dl=0|link]]. (Fabian) * New control scheme (Terrence). |
Line 48: | Line 55: |
* Sato: | * Sato: 3-4(ICRR Kashiwa) |
Agenda/Minutes of the VIS Meeting on 2019/11/22
2019/11/22 14:00 -
Participants:
Post-O3 task list Procurement list in 2019FY
Progress report
Type-A
Past week report
Shoda is working on the noise budgeting using the theoretical model. klog Though it should be confirmed further, it will be applied on other suspensions.
- Sato-san updated the 3D cad model for EXV.
Plan for coming weeks
Type B
Past week report
Plan for coming weeks
- Disassembly of the mirror hanging jig.
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM
Past week report
- Trouble of H1 coil in OMMT1?
Plan for coming weeks
- Check the DGS for the control of OSTM suspension.
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
Guardian. See this link. (Fabian)
- New control scheme (Terrence).
Travel Plans
- Travel (Week of 11/25):
- Takahashi: 27-28
- Sato:
- Hirata: 27-28
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 12/2):
- Takahashi:
- Sato: 3-4(ICRR Kashiwa)
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2019/11/29(Fri)