 * Sato-san updated the 3D cad model for EXV.
Line 21: Line 23:
Line 26: Line 29:
 * Trouble of H1 coil in OMMT1?
Line 28: Line 32:
Line 36: Line 41:
 * Guardian. See this [[https://www.dropbox.com/s/qnjz3ezz3vveo8u/GuardianTransition.pdf?dl=0|link]]. (Fabian)

Agenda/Minutes of the VIS Meeting on 2019/11/22

2019/11/22 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list Procurement list in 2019FY

Progress report

Type-A

Past week report

  • Shoda is working on the noise budgeting using the theoretical model. klog Though it should be confirmed further, it will be applied on other suspensions.

  • Sato-san updated the 3D cad model for EXV.

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

  • Disassembly of the mirror hanging jig.

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

  • Trouble of H1 coil in OMMT1?

Plan for coming weeks

  • Check the DGS for the control of OSTM suspension.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Guardian. See this link. (Fabian)

  • New control scheme (Terrence).

Travel Plans

  • Travel (Week of 11/25):
    • Takahashi: 27-28
    • Sato:
    • Hirata: 27-28
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 12/2):
    • Takahashi:
    • Sato: 3-4(ICRR Kashiwa)
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/11/29(Fri)