Line 16: Line 16:
 * ETMX GAS control saturation problem ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11831|klog#11831]])
  * F0 and F1 GAS control got saturated.
  * The height of BF has changed by +50 um in this 1 week.
  * Control output offloading is needed with fishing rods. ---> To be arranged in a few days
Line 27: Line 31:
  * The future of vistools looks quite gray (the code is complicated, not commented and we don't know how to manipulate matrix switches). Some will likely be in regular Guardian.   * The future of vistools looks quite gray (the code is complicated, not commented and we don't know how to manipulate matrix switches). Some additions will likely be in regular Guardian.

Agenda/Minutes of the VIS Meeting on 2019/11/29

2019/11/29 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list Procurement list in 2019FY

Progress report

Type-A

Past week report

  • Sato-san started the design of limit switch for FR.
  • ETMX GAS control saturation problem (klog#11831)

    • F0 and F1 GAS control got saturated.
    • The height of BF has changed by +50 um in this 1 week.
    • Control output offloading is needed with fishing rods. ---> To be arranged in a few days

Plan for coming weeks

Type B

Past week report

  • I modified the real-time model in order to accomodate bandpass fillters and new DAQ channels. See 11788.

    • For the most part I used the same scheme as Type A.
    • As agreed in the previous meeting I added a matrix ramp switch in order to transit from velocity damping to bandpass filters.
    • The medm screen was modified accordingly.
    • I realized yesterday I hadn't added a monitor for the output of the new filters banks in the EUL basis. It's been added to the real-time model, it compiles but still has to be installed.
    • Real-time models for SR suspensionsmust be compiled and installed.
  • Together with Terrence I modified vistools in order to generate functions to manipulate added filter banks. See 11788.

    • The future of vistools looks quite gray (the code is complicated, not commented and we don't know how to manipulate matrix switches). Some additions will likely be in regular Guardian.
    • I began adding code for the OBSERVATION state in a draft file.
  • There was an agreement with Okutomi-san to change Type B medm screens for something more illustrative of the signal paths.
  • The temperature in the BS area has increased. It's been lately between 23.7 and 23.8 degrees. The actuation on the top filter used to be -23,000 counts and is now -13,500 counts.
  • Yamada-kun and Yokozawa-san measured transfer functions from BS to DARM and calculated the noise contribution. See 11676, 11724, 11707.

    • The results are affected by an error in the calibration and are yet to be corrected.
    • The contributions of TM_DAMP_L and TM_DAMP_Y were considered to be high. These filters are supposed to be off in OBSERVATION state. See this plot.

    • These filters were rolled-off and the a new estimation was calculated. See this other plot.

    • The roll-off of TM_DAMP_Y was conservative.
  • Ushiba-san turned off BS TM-L DAMP filter for the FPMI state (11783). It may have been affecting the sensitivity.

  • For the purposes of ASC the diagonalization of the TM actuation with respect to the oplev was removed by commissioners and replaced by their own coil balancing and drivealign diagonalization. I couldn't find a klog for this
  • Hirata-san disassembled the mirror hanging jig and transported it to Mitaka.

Plan for coming weeks

  • Compile and install SR real-time models.
  • People have begun to modify or turn off filters which are supposed to be off in OBSEVATION state, maybe I should aim to design the bandpass filters and then implement the Guardian OBSERVATION state.

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

  • Transported the OSTM mirror.

Plan for coming weeks

  • Installation of the OSTM suspension (12/9-12).

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

Travel Plans

  • Travel (Week of 12/2):
    • Takahashi:
    • Sato: 3-4(ICRR Kashiwa)
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 12/9):
    • Takahashi: 9-12
    • Sato: 9-12
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/12/6(Fri)

KAGRA/Subgroups/VIS/VISMinutes20191129 (last edited 2019-11-29 17:22:51 by RyutaroTakahashi)